Inspections for the day of: Thursday, February 3, 2005.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-02638 BLD-Aging Inspection2/3/20052/3/20052/3/2005 12:00:00 AM NR
sign 2/3/2005 9:02:09 AM
BLD04-02492 BLD-Foundation2/2/20052/3/20052/3/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/2/2005 at 12:07:07 PM. Contact: ###-####.
BLD04-02456 BLD-Framing/Rough-in2/2/20052/3/20052/3/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/2/2005 at 1:31:21 PM. Contact: ###-####.
BLD04-00662 BLD-Final2/2/20052/3/20052/3/2005 12:00:00 AMANR
Betty; Phone #: ###-#### Internet Inspection Request from: Jan Rice
MEC04-02165 Final2/2/20052/3/20052/3/2005 12:00:00 AMAPASS
MEC04-02176 Final2/2/20052/3/20052/3/2005 12:00:00 AMANR
MEC05-00340 Final2/2/20052/3/20052/3/2005 12:00:00 AMPPASS
###-#### - STEFFEN
BLD04-02995 BLD-Foundation2/3/20052/3/20052/3/2005 12:00:00 AMPPART
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC05-00380 Final2/3/20052/3/20052/3/2005 12:00:00 AMPPASS
jim's heating ###-####
BLD04-02952 BLD-Footing2/3/20052/3/20052/3/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/3/2005 at 10:46:31 AM. Contact: ###-####. lines strung 2/3/2005 1:58:35 PM
BLD04-02950 BLD-Footing2/3/20052/3/20052/3/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/3/2005 at 10:49:02 AM. Contact: ###-####. lines strung 2/3/2005 1:57:59 PM
BLD04-02950 BLD-Footing2/3/20052/3/20052/3/2005 12:00:00 AMPPASS
###-#### - derrick lines strung 2/3/2005 1:58:24 PM
BLD04-02949 BLD-Footing2/3/20052/3/20052/3/2005 12:00:00 AMPPASS
###-#### - darrick lines strung 2/3/2005 1:57:47 PM
BLD04-02953 BLD-Footing2/3/20052/3/20052/3/2005 12:00:00 AMPPASS
###-#### - derrick lines strung 2/3/2005 1:58:46 PM
BLD04-02918 BLD-Conference2/3/20052/3/20052/3/2005 12:00:00 AMPPASS
talked to builder informed him of complaint of side set back required him survey lot lines. talked to complaintent and told her i have required builder to survey lot lines and call for a inspection.