Inspections for the day of: Tuesday, February 3, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-01993 Electrical Rough-In2/3/20092/3/20092/3/2009 4:07:42 PMPPASS
Dan Phone #: ###-#### owner has installed sunlight resistant wire, will call for service when ready, no esc this project
ESC08-00490 General Inspection2/3/20092/3/20092/3/2009 3:29:09 PMPPASS
looked ok
ELE08-02208 Electrical Rough-In2/3/20092/3/20092/3/2009 2:50:01 PMPPASS
jason Phone #: ###-#### south stair walls only ok to cover anop
ELE08-03111 Electrical Rough-In2/3/20092/3/20092/3/2009 1:57:25 PMPPASS
josh Phone #: ###-#### met owner, ok to cover building only, will need to see u/g from house later, watch for ground rods to be driven down when do ri for power, no esc this project
ELE09-00172 Rough-In Permanent Service2/2/20092/3/20092/3/2009 12:59:55 PMPPASS
MITCH NOTE:PLEASE CALL 1/2 HR PRIOR TO INSPECTION Phone #: ###-#### ric ok, kitchen, dining area, garage, p/s o/h rec ok, no esc this project
ELE08-02208 Permanent Service2/3/20092/3/20092/3/2009 12:35:54 PMPFAIL
jason Phone #: ###-#### met contractor, NEC 110.3 lugs for service disconnects shall be per listing and labelling for neutral and ground and installed per instructions
ESC07-00872 General Inspection2/3/20092/3/20092/3/2009 10:28:42 AMAPASS
looked ok
ELE08-02569 Final2/2/20092/3/20092/3/2009 9:21:07 AMAPASS
Unit No. 515-Please call Jim prior, he would like to meet up with you. He will be onsite. His no. is ###-####. Thank you! Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to final 515, 517 done before, no card to sign, no esc this project
ELE08-00409 Electrical Rough-In2/2/20092/3/20092/3/2009 8:12:49 AMAPASS
joe Phone #: ###-#### 2nd floor laundry walls only anop ok to cover