FIR06-00901
| INSP-Conference | 1/28/2009 | 1/29/2009 | | A | |
|
|
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 2/3/2009 | 2/3/2009 | 2/3/2009 4:14:40 PM | P | PART |
|
|
Pendent heads and piping at the 8th floor common corridor are okay for cover, noted heads at cable closets are not yet installed.
|
BLD08-02358
| FIRE-Final Inspection | 2/3/2009 | 2/3/2009 | 2/3/2009 4:12:50 PM | P | FAIL |
|
|
Need to provide current certification tags for the existing fire extinguishers, noted FACP is overdue annual inspection.
|
FIR08-00722
| INSP-Final Inspection | 2/2/2009 | 2/3/2009 | 2/3/2009 4:10:54 PM | A | PASS |
|
|
Fire alarm testing passed, permit finaled.
|
FIR08-00304
| INSP-Final Inspection | 2/2/2009 | 2/3/2009 | 2/3/2009 4:09:40 PM | A | PASS |
|
|
Final site inspection for fire sprinkler work completed satisfactory, permit finaled.
|
FIR08-00766
| INSP-Sprinkler Rough-in/Hydro | 2/1/2009 | 2/3/2009 | 2/3/2009 1:37:06 PM | A | NR |
|
|
Work underway for the portion of piping to be inspected-missing one 90, thrustblocks, etc., not ready at this time. Discussed AM inspection scheduled 2/4.
|
BLD08-00848
| FIRE-Final Inspection | 1/30/2009 | 2/3/2009 | 2/3/2009 1:33:46 PM | A | PASS |
|
|
Lane marking provided, structural inspector to verify lever action hardware has been installed at the pressbox exit door or provide visual indicator and signage with the keyed lock per IFC exceptions for B occupancies.
|