Inspections for the day of: Tuesday, February 3, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00788 Random Inspection2/3/20092/3/20092/3/2009 3:59:40 PMAPASS
ESC09-00014 Site Preparation1/30/20092/3/20092/3/2009 3:59:26 PMAPASS
ESC08-00790 Random Inspection2/3/20092/3/20092/3/2009 3:59:10 PMAPASS
ESC08-00789 Random Inspection2/3/20092/3/20092/3/2009 3:58:57 PMAPASS
ESC08-00491 Tracking Control2/3/20092/3/20092/3/2009 2:55:13 PMPFAIL
Written Correction Notice to RP:
Correct all violations by 2/5/09 PM
1. Clean up all sediment off all hard surfaces.
2. Maintain all D.I.'s.
3. Block off all access points onto the project area that are not stabilized by utilizing a barrier type fencing (high visability fence with T-post or chain link fence)
Fail ure to comply will result in further enforcement. Which may result in a stop work order.
Will re-inspect on 2/6/09AM

Spoke with the RP (George) over the staps that will be taken to correct all of the violations.
ESC08-00933 General Inspection2/3/20092/3/20092/3/2009 2:46:21 PMPPASS
No activity has occured during the last week.
ESC08-00674 Site Final2/2/20092/3/20092/3/2009 11:19:36 AMAFAIL
Verbal to RP:
Need to stabilize all disturbed soil. Also remove all temporary bmp's pertaining with the project.