Inspections for the day of: Wednesday, February 3, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00671 INSP-Final Inspection2/1/20102/3/20102/3/2010 4:51:38 PMPPASS
Overhead modifications per this permit are acceptable. However, noted existing spacing issues at several locations in the adjacent work area. Discussed permit work to resolve deficiencies.
FIR10-00024 INSP-Final Inspection2/1/20102/3/20102/3/2010 4:47:26 PMPPASS
Fire sprinkler permit work passed field inspection.
FIR09-00585 INSP-Sprinkler Rough-in/Hydro2/1/20102/3/20102/3/2010 4:46:30 PMPPART
Final pending updated plans for field modifications beyond scope of original permit work. Installation appears satisfactory, rough-in passed.
FIR09-00369 INSP-Final Inspection2/1/20102/3/20102/3/2010 4:44:09 PMPPASS
Site inspection passed, fire sprinkler permit finaled.
FIR09-00604 INSP-Final Inspection2/1/20102/3/20102/3/2010 4:42:18 PMPPASS
Scope of fire sprinkler work completed acceptable, permit final approved.
FIR09-00538 INSP-Final Inspection2/2/20102/3/20102/3/2010 4:40:53 PMAPASS
Fire alarm work tested satisfactory, permit finaled.
BLD09-01894 FIRE-Final Inspection2/3/20102/3/20102/3/2010 4:40:07 PMAPASS
Vanilla life safety finaled.
BLD09-02213 FIRE-Conference2/3/20102/3/20102/3/2010 4:39:13 PMADONE
Regarding missing doors and hardware at two locations and final inspection schedule.
FIR09-00501 INSP-Sprinkler Rough-in2/2/20102/3/20102/3/2010 4:38:18 PMAPART
Overhead fire sprinkler work is approved for cover at the drop ceilings with the exception of three areas as marked on approved plans, noted one missing head at the roof access hatch closet.