Inspections for the day of: Thursday, February 3, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00297 FIR-Aging Inspection2/3/20112/3/20112/9/2011 11:52:23 AM NR
Per Bill these open permits will be taken care of shortly.
FIR10-00298 FIR-Aging Inspection2/3/20112/3/20112/9/2011 11:51:15 AM NR
Per Bill these open permits will be taken care of shortly.
FIR11-00012 INSP-Final Inspection2/3/20112/3/20112/4/2011 10:03:50 AMPPASS
Permit finaled
FIR09-00082 INSP-Final Inspection2/2/20112/3/20112/3/2011 3:52:39 PMPCANC
Cancelled due to time constraints with micron plan review and inspection work load. Also per Guy, the fire sprinkler contractor needed to get setup for the phase reversal and loss of power signals. Will probably be rescheduled for next week.
FIR10-00655 INSP-Sprinkler Rough-in2/3/20112/3/20112/3/2011 3:49:26 PMPCANC
Cancelled due to time constraints with micron plan review and inspection work load.
BLD10-02218 FIRE-Conference2/3/20112/3/20112/3/2011 3:21:12 PMPDONE
I went over life safety requirements with Jr. These plans were not routed to Fire but have a life safety sign off.
FIR09-00095 INSP-Final Inspection2/2/20112/3/20112/3/2011 9:22:40 AMPFAIL
All signals are ok except the trouble signals are not being sent out from the AES but restore signals are being sent out on the intella tap. It appears the wiring between the AES and the FACP may be suspect.
BLD10-02789 FIRE-Final Inspection2/2/20112/3/20112/3/2011 9:19:32 AMAPASS
Life safety passed.