FIR10-00297
| FIR-Aging Inspection | 2/3/2011 | 2/3/2011 | 2/9/2011 11:52:23 AM | | NR |
|
|
Per Bill these open permits will be taken care of shortly.
|
FIR10-00298
| FIR-Aging Inspection | 2/3/2011 | 2/3/2011 | 2/9/2011 11:51:15 AM | | NR |
|
|
Per Bill these open permits will be taken care of shortly.
|
FIR11-00012
| INSP-Final Inspection | 2/3/2011 | 2/3/2011 | 2/4/2011 10:03:50 AM | P | PASS |
|
|
Permit finaled
|
FIR09-00082
| INSP-Final Inspection | 2/2/2011 | 2/3/2011 | 2/3/2011 3:52:39 PM | P | CANC |
|
|
Cancelled due to time constraints with micron plan review and inspection work load. Also per Guy, the fire sprinkler contractor needed to get setup for the phase reversal and loss of power signals. Will probably be rescheduled for next week.
|
FIR10-00655
| INSP-Sprinkler Rough-in | 2/3/2011 | 2/3/2011 | 2/3/2011 3:49:26 PM | P | CANC |
|
|
Cancelled due to time constraints with micron plan review and inspection work load.
|
BLD10-02218
| FIRE-Conference | 2/3/2011 | 2/3/2011 | 2/3/2011 3:21:12 PM | P | DONE |
|
|
I went over life safety requirements with Jr. These plans were not routed to Fire but have a life safety sign off.
|
FIR09-00095
| INSP-Final Inspection | 2/2/2011 | 2/3/2011 | 2/3/2011 9:22:40 AM | P | FAIL |
|
|
All signals are ok except the trouble signals are not being sent out from the AES but restore signals are being sent out on the intella tap. It appears the wiring between the AES and the FACP may be suspect.
|
BLD10-02789
| FIRE-Final Inspection | 2/2/2011 | 2/3/2011 | 2/3/2011 9:19:32 AM | A | PASS |
|
|
Life safety passed.
|