ELE09-02279
| ELE-Aging Inspection | 2/3/2011 | 2/3/2011 | 2/7/2011 4:29:54 PM | | CANC |
|
|
|
ELE11-00210
| Electrical Rough-In | 2/3/2011 | 2/3/2011 | 2/3/2011 1:45:59 PM | P | PASS |
|
|
area by front door, two restrooms, showers and open office space by front windows. Phone #: ###-#### >> Inspection requested via web by Jim Snodgrass ri ok
|
ELE11-00209
| Permanent Service | 2/3/2011 | 2/3/2011 | 2/3/2011 1:40:34 PM | P | NR |
|
|
Brent Lee Phone #: ###-#### NEC 230.24 10 ft clearance at the drip loop of the service drop
|
ELE11-00214
| Temporary Service | 2/3/2011 | 2/3/2011 | 2/3/2011 1:33:46 PM | P | PASS |
|
|
call steve ###-#### t/s u/g n ok
|
ELE11-00208
| Electrical Rough-In | 2/2/2011 | 2/3/2011 | 2/3/2011 12:41:17 PM | P | PASS |
|
|
walls only.... Phone #: ###-#### >> Inspection requested via web by jason ewals ri ok
|
ELE10-02869
| Final | 2/2/2011 | 2/3/2011 | 2/3/2011 9:39:49 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Steve Craig final ok
|
ELE11-00207
| Electrical Rough-In | 2/2/2011 | 2/3/2011 | 2/3/2011 9:20:36 AM | A | PASS |
|
|
Wall - Ceiling rough-in inspection Project Contact - Max Cole ###-#### Phone #: ###-#### >> Inspection requested via web by Kevin Perez ri ok
|
GCE10-00151
| GCE-Final | 2/2/2011 | 2/3/2011 | 2/3/2011 8:54:59 AM | A | PASS |
|
|
finalBill @ ###-####call for access final ok
|
GCE10-00149
| GCE-Final | 2/2/2011 | 2/3/2011 | 2/3/2011 8:54:29 AM | A | PASS |
|
|
finalBill @ ###-####call for access final ok
|
ELE11-00166
| Temporary Service | 2/2/2011 | 2/3/2011 | 2/3/2011 8:53:57 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Josh Craig t/s u/g n ok
|