Inspections for the day of: Friday, February 3, 2012.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC11-01726 Mec-Aging Inspection2/3/20122/3/20122/7/2012 2:42:26 PM PEND
i called the g/c and he will contact heating contractor to schedule for a final
MEC11-01688 Mec-Aging Inspection2/3/20122/3/20122/7/2012 9:40:55 AM PASS
wip per g/c
MEC11-01697 Mec-Aging Inspection2/3/20122/3/20122/7/2012 9:37:36 AM PEND
called becky...she will check on job and call me back
GCM11-00225 GCM-Final2/3/20122/3/20122/3/2012 4:41:05 PMPPASS
Blake @ ###-####
GCM12-00017 GCM-Final2/3/20122/3/20122/3/2012 4:40:45 PMPPASS
shannon ###-####
MEC11-03608 Final2/3/20122/3/20122/3/2012 3:31:36 PMPPASS
equipment all existing (furn/wh)
MEC11-03608 Pressure Test2/3/20122/3/20122/3/2012 3:31:10 PMPPASS
Adding Gas Line to Range. Will Be Ready after 2 p:m Phone #: ###-#### >> Inspection requested via web by Russ Curtis...20lb gas ok
MEC12-00360 Final2/3/20122/3/20122/3/2012 2:48:37 PMPFAIL
Call Mile to coordinate time for inspection Phone #: ###-#### >> Inspection requested via web by Tom Soniville...nobody home...left a notice on the door
MEC11-02611 Final2/3/20122/3/20122/3/2012 1:47:29 PMPPASS
Please final off... Just fans and laundry vent. Thanks Phone #: ###-#### >> Inspection requested via web by Jennifer Roy
MEC12-00330 Final2/3/20122/3/20122/3/2012 1:46:09 PMPPASS
standing gas f/p
MEC12-00330 Pressure Test2/3/20122/3/20122/3/2012 1:45:50 PMPPASS
We would like to have this around 1 pm if at all possible please, Thanks,Rene`. Phone #: ###-#### >> Inspection requested via web by Rene Neumeyer...20lb gas ok
MEC12-00370 Final2/3/20122/3/20122/3/2012 12:55:50 PMPCANC
late pm please, thanks dixie Phone #: ###-#### >> Inspection requested via web by Shannon Wells Inspection cancelled from web by: Shannon Wells
MEC12-00370 Pressure Test2/3/20122/3/20122/3/2012 12:55:49 PMPCANC
late pm please, thanks dixie Phone #: ###-#### >> Inspection requested via web by Shannon Wells Inspection cancelled from web by: Shannon Wells
MEC12-00324 Final2/3/20122/3/20122/3/2012 12:17:56 PMPCANC
Please inspect as early as possible. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
MEC12-00332 Pressure Test2/3/20122/3/20122/3/2012 12:03:58 PMPCANC
Scheduled gas pressure test for 2/3/2012 PM. Please call George Durller before going out at ###-#### Phone #: ###-#### >> Inspection requested via web by Ernestina Garcia...did this in the am
MEC12-00306 Final2/2/20122/3/20122/3/2012 12:03:29 PMAPASS
call shannon 30 minutes before inspection so they can meet me with the ladder ###-####
GCM12-00017 GCM-Final2/2/20122/3/20122/3/2012 12:03:12 PMAPEND
Francis @ ###-####...this was a pm inspection
MEC12-00332 Pressure Test2/2/20122/3/20122/3/2012 12:02:12 PMAPART
early as possible//George Durller Phone #: ###-####...20lb gas ok....need to seal all metal duct seams...need 1/4" slope per floot on flue back to furnace
MEC12-00312 Final2/2/20122/3/20122/3/2012 12:01:16 PMAPASS
call home owner on the way
GCM12-00012 GCM-Final2/2/20122/3/20122/3/2012 12:00:59 PMAFAIL
Homeowner @ ###-####...need 3 screws in flue
GCM11-00225 GCM-Rough In & Pressure Test2/2/20122/3/20122/3/2012 9:45:52 AMAPASS
Blake @ ###-####
GCM12-00006 GCM-Final2/2/20122/3/20122/3/2012 9:31:51 AMAFAIL
Scott @ ###-####...need to open up f/p for inspection