MEC11-01726
| Mec-Aging Inspection | 2/3/2012 | 2/3/2012 | 2/7/2012 2:42:26 PM | | PEND |
|
|
i called the g/c and he will contact heating contractor to schedule for a final
|
MEC11-01688
| Mec-Aging Inspection | 2/3/2012 | 2/3/2012 | 2/7/2012 9:40:55 AM | | PASS |
|
|
wip per g/c
|
MEC11-01697
| Mec-Aging Inspection | 2/3/2012 | 2/3/2012 | 2/7/2012 9:37:36 AM | | PEND |
|
|
called becky...she will check on job and call me back
|
GCM11-00225
| GCM-Final | 2/3/2012 | 2/3/2012 | 2/3/2012 4:41:05 PM | P | PASS |
|
|
Blake @ ###-####
|
GCM12-00017
| GCM-Final | 2/3/2012 | 2/3/2012 | 2/3/2012 4:40:45 PM | P | PASS |
|
|
shannon ###-####
|
MEC11-03608
| Final | 2/3/2012 | 2/3/2012 | 2/3/2012 3:31:36 PM | P | PASS |
|
|
equipment all existing (furn/wh)
|
MEC11-03608
| Pressure Test | 2/3/2012 | 2/3/2012 | 2/3/2012 3:31:10 PM | P | PASS |
|
|
Adding Gas Line to Range. Will Be Ready after 2 p:m Phone #: ###-#### >> Inspection requested via web by Russ Curtis...20lb gas ok
|
MEC12-00360
| Final | 2/3/2012 | 2/3/2012 | 2/3/2012 2:48:37 PM | P | FAIL |
|
|
Call Mile to coordinate time for inspection Phone #: ###-#### >> Inspection requested via web by Tom Soniville...nobody home...left a notice on the door
|
MEC11-02611
| Final | 2/3/2012 | 2/3/2012 | 2/3/2012 1:47:29 PM | P | PASS |
|
|
Please final off... Just fans and laundry vent. Thanks Phone #: ###-#### >> Inspection requested via web by Jennifer Roy
|
MEC12-00330
| Final | 2/3/2012 | 2/3/2012 | 2/3/2012 1:46:09 PM | P | PASS |
|
|
standing gas f/p
|
MEC12-00330
| Pressure Test | 2/3/2012 | 2/3/2012 | 2/3/2012 1:45:50 PM | P | PASS |
|
|
We would like to have this around 1 pm if at all possible please, Thanks,Rene`. Phone #: ###-#### >> Inspection requested via web by Rene Neumeyer...20lb gas ok
|
MEC12-00370
| Final | 2/3/2012 | 2/3/2012 | 2/3/2012 12:55:50 PM | P | CANC |
|
|
late pm please, thanks dixie Phone #: ###-#### >> Inspection requested via web by Shannon Wells Inspection cancelled from web by: Shannon Wells
|
MEC12-00370
| Pressure Test | 2/3/2012 | 2/3/2012 | 2/3/2012 12:55:49 PM | P | CANC |
|
|
late pm please, thanks dixie Phone #: ###-#### >> Inspection requested via web by Shannon Wells Inspection cancelled from web by: Shannon Wells
|
MEC12-00324
| Final | 2/3/2012 | 2/3/2012 | 2/3/2012 12:17:56 PM | P | CANC |
|
|
Please inspect as early as possible. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
|
MEC12-00332
| Pressure Test | 2/3/2012 | 2/3/2012 | 2/3/2012 12:03:58 PM | P | CANC |
|
|
Scheduled gas pressure test for 2/3/2012 PM. Please call George Durller before going out at ###-#### Phone #: ###-#### >> Inspection requested via web by Ernestina Garcia...did this in the am
|
MEC12-00306
| Final | 2/2/2012 | 2/3/2012 | 2/3/2012 12:03:29 PM | A | PASS |
|
|
call shannon 30 minutes before inspection so they can meet me with the ladder ###-####
|
GCM12-00017
| GCM-Final | 2/2/2012 | 2/3/2012 | 2/3/2012 12:03:12 PM | A | PEND |
|
|
Francis @ ###-####...this was a pm inspection
|
MEC12-00332
| Pressure Test | 2/2/2012 | 2/3/2012 | 2/3/2012 12:02:12 PM | A | PART |
|
|
early as possible//George Durller Phone #: ###-####...20lb gas ok....need to seal all metal duct seams...need 1/4" slope per floot on flue back to furnace
|
MEC12-00312
| Final | 2/2/2012 | 2/3/2012 | 2/3/2012 12:01:16 PM | A | PASS |
|
|
call home owner on the way
|
GCM12-00012
| GCM-Final | 2/2/2012 | 2/3/2012 | 2/3/2012 12:00:59 PM | A | FAIL |
|
|
Homeowner @ ###-####...need 3 screws in flue
|
GCM11-00225
| GCM-Rough In & Pressure Test | 2/2/2012 | 2/3/2012 | 2/3/2012 9:45:52 AM | A | PASS |
|
|
Blake @ ###-####
|
GCM12-00006
| GCM-Final | 2/2/2012 | 2/3/2012 | 2/3/2012 9:31:51 AM | A | FAIL |
|
|
Scott @ ###-####...need to open up f/p for inspection
|