ESC13-00288
| General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 12:44:55 PM | | PASS |
|
|
Road re-alignment is in progress. Some minor track out from equipment onto Evening Star. RP Jim on site, will sweep at end of the day. Approved.
|
ESC13-00357
| General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 12:28:44 PM | | PASS |
|
|
Work almost complete. BLD permit still open. No stockpiles or trench cutting remaining.
|
ESC12-01035
| General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 11:54:02 AM | | PASS |
|
|
|
ESC12-00677
| General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 11:23:53 AM | | PASS |
|
|
Perimeter BMPs and washouts in good condition. Streets are clean, drop inlet bags with remaining capacity. Individual lots have seperate permits. Approved.
|
ESC13-01075
| Site Preparation | 1/31/2014 | 2/3/2014 | 2/3/2014 11:20:33 AM | A | CANC |
|
|
Austin Phone #: ###-####
No activity. Site is ready for excavation.
|
ESC13-01074
| Site Preparation | 1/31/2014 | 2/3/2014 | 2/3/2014 11:19:20 AM | A | PASS |
|
|
Austin Phone #: ###-####
Ready for excavation. Silt fence along Timbersaw will remain installed. Access via alley way. Approved.
|
ESC13-00230
| General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 11:05:47 AM | | PASS |
|
|
Westend of central area is bermed to contain snow melt. Streets are clean. No corrections at this time.
|
ESC13-00266
| Aging Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 10:40:52 AM | | PASS |
|
|
House construction is near completion. Yard is not yet landscaped. Wattles lining sidewalk. Approved.
|
ESC13-00144
| General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 10:27:34 AM | | PASS |
|
|
Conference on Friday 1/31 discussed remaining stabilization and future ACHD road project. MIke Sheppard stated that banks along Greenbelt would be vegetated and also the former staging area. No corrections at this time.
|