Inspections for the day of: Monday, February 3, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00288 General Inspection2/3/20142/3/20142/3/2014 12:44:55 PM PASS
Road re-alignment is in progress. Some minor track out from equipment onto Evening Star. RP Jim on site, will sweep at end of the day. Approved.
ESC13-00357 General Inspection2/3/20142/3/20142/3/2014 12:28:44 PM PASS
Work almost complete. BLD permit still open. No stockpiles or trench cutting remaining.
ESC12-01035 General Inspection2/3/20142/3/20142/3/2014 11:54:02 AM PASS
ESC12-00677 General Inspection2/3/20142/3/20142/3/2014 11:23:53 AM PASS
Perimeter BMPs and washouts in good condition. Streets are clean, drop inlet bags with remaining capacity. Individual lots have seperate permits. Approved.
ESC13-01075 Site Preparation1/31/20142/3/20142/3/2014 11:20:33 AMACANC
Austin Phone #: ###-####

No activity. Site is ready for excavation.
ESC13-01074 Site Preparation1/31/20142/3/20142/3/2014 11:19:20 AMAPASS
Austin Phone #: ###-####

Ready for excavation. Silt fence along Timbersaw will remain installed. Access via alley way. Approved.
ESC13-00230 General Inspection2/3/20142/3/20142/3/2014 11:05:47 AM PASS
Westend of central area is bermed to contain snow melt. Streets are clean. No corrections at this time.
ESC13-00266 Aging Inspection2/3/20142/3/20142/3/2014 10:40:52 AM PASS
House construction is near completion. Yard is not yet landscaped. Wattles lining sidewalk. Approved.
ESC13-00144 General Inspection2/3/20142/3/20142/3/2014 10:27:34 AM PASS
Conference on Friday 1/31 discussed remaining stabilization and future ACHD road project. MIke Sheppard stated that banks along Greenbelt would be vegetated and also the former staging area. No corrections at this time.