Inspections for the day of: Wednesday, February 3, 2016.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00171 FIRE-Final Inspection2/3/20162/3/20162/3/2016 2:10:09 PMPPASS
Life safety passed. Tenant to install sticker at the main exit as discussed prior to a building sign off.
BLD16-00174 FIRE-Conference2/2/20162/3/20162/3/2016 11:18:33 AMADONE
Phone #: ###-#### Matthew greenman and I spoke about the new wall and how the existing fire sprinkler system and smoke evac system will need to be modified so that coverage is maintained on both sides of the wall. They do have an option of getting approval from Scott if an agreement in writing is reached since new tenants are moving in on both sides of this wall and their construction is to begin soon.
BLD16-00082 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:38:10 AMAPASS
life safety passed
BLD16-00081 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:37:39 AMAPASS
life safety passed
BLD16-00080 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:37:20 AMAPASS
life safety passed
BLD16-00079 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:36:06 AMAPASS
life safety passed
BLD16-00078 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:32:32 AMAPASS
life safety passed
BLD16-00077 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:32:05 AMAPASS
life safety passed
BLD16-00076 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:31:39 AMAPASS
life safety passed
BLD16-00075 FIRE-Final Inspection2/2/20162/3/20162/3/2016 10:31:14 AMAPASS
life safety passed
FIR15-00575 INSP-Sprinkler Rough-in2/2/20162/3/20162/3/2016 8:14:17 AMAPART
Overhead rough-in passed but the piping can not be covered because many of the upright sprinkler heads have been painted. When they have been changed out a re-inspection will be needed for cover.