BLD16-03291
| BLD-Final | 2/2/2017 | 2/3/2017 | 2/3/2017 5:02:45 PM | P | FAIL |
|
|
josh Phone #: ###-####. Nees zoning final.. Also noted that existing gate was to be removed from outdoor seating and handrails installed as this is part of the egress path as noted on the approved plans.
|
BLD16-04584
| BLD-Framing/Rough-in | 2/2/2017 | 2/3/2017 | 2/3/2017 3:52:04 PM | P | PASS |
|
|
Kenji Phone #: ###-####
|
BLD17-00127
| BLD-Final | 2/2/2017 | 2/3/2017 | 2/3/2017 3:28:01 PM | P | PASS |
|
|
would like call ahead; Kelsey Phone #: ###-####. Ok for perm occ.
|
BLD17-00007
| BLD-Framing/Rough-in | 2/2/2017 | 2/3/2017 | 2/3/2017 3:27:39 PM | P | PASS |
|
|
Garrett// please call 20 min ahead Phone #: ###-####
|
BLD15-04496
| BLD-Final | 2/3/2017 | 2/3/2017 | 2/3/2017 2:47:27 PM | P | PEND |
|
|
Austin-please ask for the rest manager or call Austin-need final for perm c of o Phone #: ###-####. Will rescheduke for monday.
|
BLD16-04174
| BLD-Framing/Rough-in | 2/3/2017 | 2/3/2017 | 2/3/2017 1:46:22 PM | P | PASS |
|
|
Phone #: ###-####. received new engineering. All work corrected per the new engineering.
|
BLD16-02179
| BLD-Final | 2/2/2017 | 2/3/2017 | 2/3/2017 1:28:39 PM | P | DONE |
|
|
Replace the existing pylon display with a new monument display Phone #: ###-#### Inspection requested via web by Ken Olsen
|
BLD16-02179
| DOC - Permit Finaled | 2/3/2017 | 2/3/2017 | 2/3/2017 1:28:31 PM | P | PASS |
|
|
|
BLD16-03242
| BLD-Conference | 2/3/2017 | 2/3/2017 | 2/3/2017 1:27:53 PM | P | DONE |
|
|
|
BLD16-03242
| BLD-Conference | 2/2/2017 | 2/3/2017 | 2/3/2017 11:43:20 AM | A | CANC |
|
|
conference for Building and Safety Final Phone #: ###-#### Inspection requested via web by Todd Landvatter. Moved to pm.
|
BLD16-02899
| BLD-Final | 2/2/2017 | 2/3/2017 | 2/3/2017 10:50:01 AM | A | CANC |
|
|
Herb Phone #: ###-#### **not sure this should be a final. herb said roof, but didn't sound too sure**
|
BLD16-02899
| BLD-Framing/Rough-in | 2/3/2017 | 2/3/2017 | 2/3/2017 10:49:15 AM | A | PASS |
|
|
Herb Phone #: ###-#### **not sure this should be a final. herb said roof, but didn't sound too sure**. Roof nailing ok.
|
BLD16-02646
| BLD-Wall Bracing | 2/2/2017 | 2/3/2017 | 2/3/2017 9:58:12 AM | A | PASS |
|
|
Sheet rock // Pat Phone #: ###-####
|
BLD16-02966
| BLD-Framing/Rough-in | 2/1/2017 | 2/3/2017 | 2/3/2017 9:31:13 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Complete lateral bracing on C03 truss. Roll block floor joist at interior bearing wall (1st.floor) between front door and barrell vault.. Ok to insulate. Correction notice issued.
|
BLD16-03107
| BLD-Framing/Rough-in | 2/2/2017 | 2/3/2017 | 2/3/2017 9:01:30 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick. Complete install of holdown in closet next to front door. Fireblock furdown between mech. shafts upstairs. provide truss engineering. ok to insulate.
|
BLD16-02992
| BLD-Final | 2/3/2017 | 2/3/2017 | 2/3/2017 12:00:00 AM | P | CANC |
|
|
Dustin Phone #: ###-####
|