Inspections for the day of: Friday, February 3, 2017.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01210 General Inspection2/3/20172/3/20172/6/2017 11:27:12 AM PASS
No trackout. BMPs in place no corrections needed.
ESC16-01547 Site Preparation2/2/20172/3/20172/3/2017 4:43:00 PMACANC
Joey Phone #: ###-####
No trackout. DI bags in place.
ESC16-01548 Site Preparation2/2/20172/3/20172/3/2017 4:42:46 PMACANC
Joey Phone #: ###-####
ESC16-01549 Site Preparation2/2/20172/3/20172/3/2017 4:42:38 PMACANC
Joey Phone #: ###-####
No trackout. DI bags in place.
ESC16-01542 Site Preparation2/2/20172/3/20172/3/2017 4:42:25 PMAPASS
Joey Phone #: ###-####
No trackout. DI bags in place.
ESC15-01483 General Inspection2/3/20172/3/20172/3/2017 3:57:12 PM PASS
ESC16-01368 BMP Violation1/30/20172/3/20172/3/2017 3:13:28 PMPFAIL
Stockpiles moved back from sidewalk and BMP controls in place. No corrections have been made. See stop work order.
ESC16-01368 Stop Work Order2/3/20172/3/20172/3/2017 3:12:41 PMPDONE
No attempt at corrections. Active discharge. Mud mixed with snow melt running off into street towards storm drain. No concrete washout. Concrete slurry dumped onto mud. Snow melt mixed with concrete slurry running into street towards the storm drain. Oily sheen visible in run off water. No trash containment. Stop work order issued.