PLM00-00275
| Plumbing Rough-in | 2/3/2000 | 2/4/2000 | 2/4/2000 12:00:00 AM | A | PASS |
|
|
###-#### Pat R/I ok. 2/7/00 9:04:34 AM
|
PLM00-00291
| Plumbing Rough-in | 2/3/2000 | 2/4/2000 | 2/4/2000 12:00:00 AM | A | PASS |
|
|
pager ###-#### voice Install premise protection and thermal tank. 2/7/00 9:04:28 AM
|
PLM99-03620
| Final | 2/3/2000 | 2/4/2000 | 2/4/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 17:03:01. Contact: ###-####. Install tub meter. 2/7/00 9:04:45 AM
|
PLM00-00049
| Water and/or Sewer | 2/4/2000 | 2/4/2000 | 2/4/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 08:09:44. Contact: ###-####. Outside sewer and interceptor ok. 2/7/00 9:05:36 AM
|
PLM00-00020
| Final | 2/4/2000 | 2/4/2000 | 2/4/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 08:12:22. Contact: ###-####. Install WH pan and pipe to floor drain. 2/7/00 9:05:23 AM
|