Inspections for the day of: Friday, February 4, 2000.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR00-00025 INSP-Sprinkler Rough-in2/4/20002/4/20002/4/2000 12:00:00 AMAPART
4 inch T600 line from building to 13th street. not complete to UW service
BLD99-01422 FIRE-Final Inspection2/3/20002/4/20002/4/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/03/2000 at 11:38:56. Contact: ###-####. C/N issued. 2/7/00 8:48:23 AM
BLD98-03865 FIRE-Hydro test above ground2/3/20002/4/20002/4/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/03/2000 at 13:41:26. Contact: ###-####. 6th floor hydro ok. 2/7/00 8:48:08 AM
BLD99-03205 FIRE-Final Inspection2/3/20002/4/20002/4/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/03/2000 at 15:35:36. Contact: ###-####.
FIR99-00693 INSP-Sprinkler Rough-in2/4/20002/4/20002/4/2000 12:00:00 AMPPART
mick ###-#### Ok on hydro test & sprinkler R/I C/N issued on monitoring system. 2/7/00 8:56:22 AM
BLD99-03312 FIRE-Conference2/3/20002/4/20002/3/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 02/03/2000 at 12:13:06. Contact: ###-####.
BLD99-02648 FIRE-Final Inspection2/3/20002/4/20002/3/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 02/03/2000 at 09:05:20. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/03/2000 at 09:12:12.