PLM01-04188
| Final | 2/1/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | A | PART |
|
|
troy ###-#### need to see roof drain connection when installed 2/4/2002 2:17:43 PM
|
PLM02-00091
| Water and/or Sewer | 2/1/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 13:25:18. Contact: ###-####.
|
PLM01-04222
| Final | 2/1/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 13:47:50. Contact: ###-####. need to have premis protection recertified has not been done since1996.need to provide adequate thermal expansion tank for water heater told general contractor 2/4/2002 11:48:41 AM
|
PLM02-00255
| Plumbing Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-00256
| Water and/or Sewer | 2/4/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | P | PASS |
|
|
###-#### WATER LINE ONLY
|
PLM02-00084
| Water and/or Sewer | 2/4/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 10:01:29. Contact: ###-####.
|
PLM01-02107
| Plumbing Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 10:14:33. Contact: ###-####.
|
PLM01-04222
| Final | 2/4/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 11:02:31. Contact: ###-####.
|
PLM02-00091
| Plumbing Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 2/4/2002 1:30:34 PM
|
PLM02-00254
| Water and/or Sewer | 2/4/2002 | 2/4/2002 | 2/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 2/4/2002 5:50:48 PM
|
PLM02-00241
| Plumbing Rough-in | 2/1/2002 | 2/4/2002 | 2/1/2002 12:00:00 AM | A | CANC |
|
|
###-#### NELS Disp set to [CANC] by a contractor via Hello! on 02/01/2002 at 16:56:29.
|