Inspections for the day of: Monday, February 4, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00240 Rough-in2/1/20022/4/20022/4/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/01/2002 at 11:12:11. Contact: ###-####.
MEC02-00240 Pressure Test2/1/20022/4/20022/4/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/01/2002 at 11:12:37. Contact: ###-####.
BLD01-03057 BLD-Framing/Rough-in2/1/20022/4/20022/4/2002 12:00:00 AMAFAIL
SHEER WALL JAMES- ###-#### corrections needed--fastening required above hd's and upstairs are a few shear panels needing additional staples or nails. 2/4/2002 9:54:25 AM
BLD01-02372 BLD-Framing/Rough-in2/1/20022/4/20022/4/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 02/01/2002 at 13:31:28. Contact: . Cancelled by contractor 2/4/2002 11:55:05 AM
BLD02-00113 BLD-Foundation2/3/20022/4/20022/4/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/03/2002 at 15:52:56. Contact: ###-####. wip--15% ready at time of inspection 2/4/2002 9:28:28 AM
BLD01-03038 BLD-Foundation2/4/20022/4/20022/4/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/04/2002 at 07:09:45. Contact: ###-####. WIP--25% at time of inspection. 2/4/2002 12:46:46 PM
BLD02-00115 BLD-Footing2/4/20022/4/20022/4/2002 12:00:00 AMPPART
JACK ###-#### wip--45% completed at time of inspection. 2/4/2002 2:48:55 PM
BLD02-00050 BLD-Foundation2/4/20022/4/20022/4/2002 12:00:00 AMPPART
CLINT ###-#### WALL FOUNDATION wip--40% ready at time of inspection. 2/4/2002 2:14:54 PM
MEC02-00301 Rough-in2/4/20022/4/20022/4/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/04/2002 at 09:23:54. Contact: ###-####. c/n posted on site--exh. fans install including ducts and insulate all Y's in un-heated space. 2/4/2002 1:19:43 PM
MEC02-00301 Pressure Test2/4/20022/4/20022/4/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/04/2002 at 09:24:18. Contact: ###-####.
BLD01-03057 BLD-Framing/Rough-in2/1/20022/4/20022/4/2002 12:00:00 AMPPASS
SHEER WALL JAMES- ###-#### SHEAR--OK TO SIDE. 2/4/2002 12:42:14 PM
BLD01-02814 BLD-Framing/Rough-in2/1/20022/4/20022/4/2002 12:00:00 AMPFAIL
SHEER PANEL RICK- ###-#### c/n posted--missing MST straps, (front of garage to second floor), nailing light at misc. locations and missing straps west of house 2/4/2002 3:12:20 PM