Inspections for the day of: Tuesday, February 4, 2003.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02442 BLD-Aging Inspection2/4/20032/4/20032/4/2003 12:00:00 AM DONE
as per plan. 2/4/2003 7:43:15 AM
BLD02-02550 BLD-Aging Inspection2/4/20032/4/20032/4/2003 12:00:00 AM PASS
BLD00-01894 BLD-Aging Inspection2/4/20032/4/20032/4/2003 12:00:00 AM PART
wip 2/4/2003 7:34:58 AM
BLD02-01843 BLD-Foundation2/4/20032/4/20032/4/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 2/4/2003 at 7:23:18 AM. Contact: ###-####. pw/oi 2/4/2003 10:04:59 AM
MEC03-00271 Rough-in2/3/20032/4/20032/4/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 2/3/2003 at 3:06:42 PM. Contact: ###-####. vent fans not instaled. 2/4/2003 10:00:07 AM
MEC03-00271 Pressure Test2/3/20032/4/20032/4/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/3/2003 at 3:06:58 PM. Contact: ###-####.
MEC02-01967 Final2/4/20032/4/20032/4/2003 12:00:00 AMAFAIL
need cut off swich at furnace. 2/4/2003 9:29:03 AM
BLD02-02686 BLD-Framing/Rough-in2/3/20032/4/20032/4/2003 12:00:00 AMAPART
need ele aproval for cover/ air sealants spot check ok to insulate. 2/4/2003 9:09:24 AM
BLD02-02863 BLD-Footing1/30/20032/4/20032/4/2003 12:00:00 AMPPART
###-#### ###-#### wip special insp pending. 2/4/2003 2:31:33 PM
BLD02-02766 BLD-Other2/3/20032/4/20032/4/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/03/2003 at 10:21:50. Contact: ###-####.wip 2/4/2003 2:48:34 PM
BLD02-02943 BLD-Framing/Rough-in2/3/20032/4/20032/4/2003 12:00:00 AMPPART
###-#### ###-#### exterior ok for cover. 2/4/2003 3:13:04 PM
MEC03-00244 Rough-in2/3/20032/4/20032/4/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/03/2003 at 14:29:11. Contact: ###-####. called and will resch.. 2/4/2003 1:30:57 PM
BLD02-02927 BLD-Wall cover2/4/20032/4/20032/4/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 2/4/2003 at 8:33:54 AM. Contact: ###-####. top of pannels only aproved fo cover with out re-insp.. 2/4/2003 3:32:56 PM