PLM03-00266
| Other | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | PART |
|
|
conference, dropped off sewer map for reference 2/4/2003 9:57:48 AM
|
PLM03-00272
| Final | 2/3/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | PASS |
|
|
water\\###-#### water service final ok 2/4/2003 9:57:04 AM
|
PLM03-00160
| Plumbing Rough-in | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/4/2003 at 8:37:03 AM. Contact: ###-####. needs to set a 1 1/4" shutoff valve, 1 1/4x 1 tee to the water heater and then a 1 1/4" x 1" x 1" tee to the master bath 2/4/2003 4:26:07 PM
|
PLM02-03330
| Final | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | PASS |
|
|
###-#### entry code 0000 final ok 2/4/2003 3:29:48 PM
|
PLM02-01505
| Sprinkler (Final) | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | NR |
|
|
will call in when the pvb is tested 2/4/2003 2:46:49 PM
|
PLM03-00266
| Water and/or Sewer | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | PASS |
|
|
sewer rerout to get out from under the new shop 2/4/2003 3:05:21 PM
|
PLM03-00266
| Groundwork | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | PASS |
|
|
gw in shop ok
|
PLM03-00209
| Sprinkler (Final) | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | PART |
|
|
tie in ok needs testing
|
PLM02-02728
| Water and/or Sewer | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | PASS |
|
|
waters on final ok
|