MIS02-00317
| MIS-Aging Inspection | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | | DONE |
|
|
|
BLD02-02507
| BLD-Final | 1/31/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | PASS |
|
|
jay re-insp ###-#### Job complete. 2/4/2003 1:07:41 PM
|
MEC02-02643
| Final | 2/3/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 13:11:34. Contact: ###-####. complete c/n for combustion air, as written by prior inspector. 2/4/2003 10:08:40 AM
|
MEC02-03184
| Final | 2/3/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 13:43:45. Contact: ###-####.c/n posted. 2/4/2003 12:28:24 PM
|
BLD02-00311
| BLD-Framing/Rough-in | 2/3/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | PART |
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front entry ok to ceiling. 2/4/2003 11:36:53 AM
|
BLD02-02166
| BLD-Framing/Rough-in | 2/3/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | PART |
|
|
###-#### front entry foyer area . 2/4/2003 11:08:58 AM
|
BLD02-03048
| BLD-Conference | 2/3/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 2/3/2003 at 4:28:14 PM. Contact: ###-####.Needsd to call for a framing inspection of rest room when r-i are done no new work on grid ceiling just replacement of grid, plans show adding ramp at entry for hight door for access contractor does not want to do this told him need to check with proje architect and plan review. 2/4/2003 12:53:15 PM
|
BLD02-02166
| BLD-Framing/Rough-in | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | A | CANC |
|
|
unable to do called contractor. 2/4/2003 4:43:39 PM
|
MEC02-02966
| Final | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | FAIL |
|
|
late pm ###-#### c/n posted for condensate line needs to go to the exterior, insulate plenum in garage insulate exposed metal in crawl at/near under furnace. 2/4/2003 4:38:27 PM
|
MEC03-00321
| Final | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | PASS |
|
|
|
BLD02-02908
| BLD-Final | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | PASS |
|
|
###-####. ok for a perm oc 2/4/2003 2:09:10 PM
|
BLD02-02499
| BLD-Conference | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | FAIL |
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliedid exterior shear c/n posted. 2/4/2003 4:41:30 PM
|
BLD02-03017
| BLD-Framing/Rough-in | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | NR |
|
|
ben--re-insp on shear; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliecalled contractor told them to recall. 2/4/2003 4:40:36 PM
|
BLD02-01801
| BLD-Final | 2/4/2003 | 2/4/2003 | 2/4/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 2/4/2003 at 11:13:49 AM. Contact: ###-####. needs mec inspection home owner told by me not to occupy home untill a co is issued. 2/4/2003 4:35:23 PM
|