Inspections for the day of: Wednesday, February 4, 2004.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00411 INSP-Conference2/3/20042/4/20042/4/2004 12:00:00 AMAPASS
Met with Al and reviewed custom lables with locations/room numbers - this portion of Phase I is completed and closes out any open inspection items 2/4/2004 3:03:30 PM
FIR03-00791 INSP-Final Inspection2/3/20042/4/20042/4/2004 12:00:00 AMAPASS
don; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIR03-00790 INSP-Final Inspection2/3/20042/4/20042/4/2004 12:00:00 AMAFAIL
don; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need labels on manual releases to clarify which pull operates each system; extinguisher too high 2/4/2004 9:59:13 AM
MIS04-00015 FIR-Final2/4/20042/4/20042/4/2004 12:00:00 AMAPASS
MIS04-00044 FIR-Final2/3/20042/4/20042/4/2004 12:00:00 AMAFAIL
###-#### JEN This will need a plan review for exiting; there is a full basement with one exit; the building does not have fire sprinklers 2/4/2004 9:47:59 AM
FIR03-00815 INSP-Alarm Testing2/4/20042/4/20042/4/2004 12:00:00 AMPPASS
Rick let me know what time will work for you so that I can schedule. Thanks; Phone #: ###-#### Internet Inspection Request from: Rick Groom
FIR03-00797 INSP-Alarm Testing2/4/20042/4/20042/4/2004 12:00:00 AMPPASS
Rick this is for the 3rd floor also; Phone #: ###-#### Internet Inspection Request from: Rick Groom
BLD03-02764 FIRE-Final Inspection2/4/20042/4/20042/4/2004 12:00:00 AMPPASS
FIR03-00804 INSP-Final Inspection2/4/20042/4/20042/4/2004 12:00:00 AMPPASS
BLD03-02198 FIRE-Final Inspection2/4/20042/4/20042/4/2004 12:00:00 AMPPASS
BLD03-02351 FIRE-Final Inspection2/4/20042/4/20042/4/2004 12:00:00 AMPFAIL
penetrations in corridor lid will require smoke/fire damper 2/4/2004 6:41:51 PM
FIR03-00681 INSP-Final Inspection2/3/20042/4/20042/4/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 2/3/2004 at 2:03:45 PM. Contact: ###-####. There are penetrations in the corridor lid that will require smoke/fire dmapers with smoke detectors for damper release; will verify with GC 2/4/2004 6:41:23 PM
FIR03-00758 INSP-Final Inspection2/3/20042/4/20042/4/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/3/2004 at 2:04:44 PM. Contact: ###-####.