FIR03-00801
| INSP-Final Inspection | 2/3/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | FAIL |
|
|
Sprinkler pendants are overspaced on both sides of the storage room, their square footage runs from 124 to 182 sq. ft.. Sprinkler pendants are overspaced in the copier room. The room is 223 sq. ft. with two pendants in it which is 111 sq. ft. apiece. 1" sch 40 pipe has been used to suspend 1" sch 40 pipe between trusses 32" on center. Per NFPA 13 6.1.1.3a and 6.1.1.3b 1 1/4" pipe should be used. Also the trapeze must be secured to prevent slippage 2/4/2004 11:19:49 AM
|
BLD03-01135
| FIRE-Final Inspection | 2/3/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | PART |
|
|
Fire life safety given a temporary occupancy until the fire alarm resubmittals have been approved and the alarm system tested. The sprinkler system was given a temp until the fire alarm is tested as well 2/4/2004 9:55:43 AM
|
FIR03-00448
| INSP-Sprinkler Rough-in/Hydro | 2/3/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | CANC |
|
|
Inspection needed was a cover inspection. See fir03-00554 2/4/2004 8:59:18 AM
|
FIR03-00014
| INSP-Final Inspection | 2/3/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | FAIL |
|
|
Provide strobes in the two basement corridors as discussed 2/4/2004 9:59:40 AM
|
FIR03-00554
| INSP-Sprinkler Rough-in | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | PART |
|
|
Third floor sprinkler piping is ok to cover
|
FIR03-00419
| INSP-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | PASS |
|
|
Sprinkler underground finaled
|
FIR03-00570
| INSP-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | PART |
|
|
Fire alarm given a temporary occupancy until the fire alarm resubmittals have been approved and the alarm system tested
|
FIR03-00639
| INSP-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | A | PART |
|
|
Fire alarm given a temporary occupancy until the fire alarm resubmittals have been approved and the alarm system tested
|
FIR03-00769
| INSP-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | P | FAIL |
|
|
The contractor replaced the existing battery cabinet with another that is not listed for this use. A minimum of 8 ah batteries are required. 2/4/2004 4:43:48 PM
|
BLD03-01375
| FIRE-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | P | PASS |
|
|
fire life safety finaled
|
BLD03-01530
| FIRE-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | P | FAIL |
|
|
still need handle on the fire extinguisher cabinet in the cafeteria. Fire fly door adjusted and tested
|
FIR03-00482
| INSP-Final Inspection | 1/30/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | P | PASS |
|
|
fire alarm finaled 2/4/2004 3:56:50 PM
|
BLD03-02201
| FIRE-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | P | CANC |
|
|
walt; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD02-03076
| FIRE-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | P | PASS |
|
|
fire life safety finaled 2/4/2004 2:31:51 PM
|
BLD03-01575
| FIRE-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 12:00:00 AM | P | FAIL |
|
|
fire alarm plans are not approved yet 2/4/2004 2:03:48 PM
|