BLD04-01977
| FIRE-Final Inspection | 2/4/2008 | 2/4/2008 | 2/4/2008 4:33:26 PM | P | PASS |
|
|
life safety passed.
|
BLD04-01977
| BLD-Aging Inspection | 2/4/2008 | 2/4/2008 | 2/4/2008 4:26:28 PM | P | PASS |
|
|
life safety passed
|
FIR06-00091
| INSP-Final Inspection | 2/4/2008 | 2/4/2008 | 2/4/2008 4:23:09 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00011
| INSP-Alarm Testing | 2/4/2008 | 2/4/2008 | 2/4/2008 3:46:30 PM | P | PART |
|
|
Cafeteria strobes not in-sync.Door going into back of kitchen did not latch during door closer test. See approved set of plans with red lined areas.KR
|
BLD07-01845
| FIRE-Conference | 2/4/2008 | 2/4/2008 | 2/4/2008 2:53:43 PM | P | DONE |
|
|
The fire alarm wire has been removed. Per agreement the stop work order is being lifted by Troy Cobbley.
|
FIR07-00781
| INSP-Sprinkler Rough-in | 2/1/2008 | 2/4/2008 | 2/4/2008 2:51:38 PM | P | PASS |
|
|
Sprinkler piping is ok to cover
|
FIR05-00536
| INSP-Sprinkler Rough-in | 2/4/2008 | 2/4/2008 | 2/4/2008 2:00:03 PM | P | PASS |
|
|
The sprinkler modifications in the south tower second floor at the cafeteria are complete.
|
BLD07-02328
| FIRE-Final Inspection | 2/3/2008 | 2/4/2008 | 2/4/2008 1:57:40 PM | A | FAIL |
|
|
The exit discharge lighting needs to be provided as per the originally approved plans. Also the gate through the fence needs to meet the requirments of chapter 10 access controlled egress doors since it has a magnet/security system partially installed.
|
FIR07-00988
| INSP-Final Inspection | 2/4/2008 | 2/4/2008 | 2/4/2008 12:39:34 PM | P | PASS |
|
|
permit finaled
|
FIR08-00069
| INSP-Final Inspection | 2/4/2008 | 2/4/2008 | 2/4/2008 12:38:32 PM | P | PASS |
|
|
permit finaled
|
FIR07-00988
| INSP-Sprinkler Rough-in | 2/4/2008 | 2/4/2008 | 2/4/2008 12:37:49 PM | P | PASS |
|
|
rough-in passed
|
FIR08-00069
| INSP-Sprinkler Rough-in | 2/4/2008 | 2/4/2008 | 2/4/2008 12:36:29 PM | P | PASS |
|
|
rough-in passed
|
BLD06-02741
| FIRE-Final Inspection | 1/30/2008 | 2/4/2008 | 2/4/2008 12:04:20 PM | A | PASS |
|
|
Life safety passed.
|
FIR08-00074
| INSP-Sprinkler Rough-in | 2/1/2008 | 2/4/2008 | 2/4/2008 10:09:05 AM | A | PASS |
|
|
sprinkler rough-in passed.
|
BLD08-00182
| FIRE-Final Inspection | 2/1/2008 | 2/4/2008 | 2/4/2008 8:49:08 AM | A | PASS |
|
|
Life safety passed.
|
BLD07-02328
| FIRE-Final Inspection | 2/3/2008 | 2/4/2008 | 2/3/2008 10:11:51 PM | A | CANC |
|
|
Ready after 9:00 am Phone #: ###-#### Internet Inspection Request from: Mark Bowen Inspection cancelled from web by: Mark Bowen
|