Inspections for the day of: Wednesday, February 4, 2009.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-03748 ELE-Aging Inspection2/4/20092/4/20092/10/2009 3:57:14 PM FAIL
no work done
ELE09-00183 Electrical Rough-In2/4/20092/4/20092/4/2009 4:07:47 PMPPASS
###-#### - rod
ELE09-00102 Rough-In Permanent Service2/4/20092/4/20092/4/2009 3:27:12 PMPPASS
Please reinspect Phone #: ###-#### Internet Inspection Request from: Sean Peltier
ESC08-00866 General Inspection2/4/20092/4/20092/4/2009 2:54:31 PMPPASS
looks good
ESC07-00904 General Inspection2/4/20092/4/20092/4/2009 2:54:18 PMPPASS
looks good
ELE09-00168 Electrical Rough-In2/4/20092/4/20092/4/2009 2:51:00 PMPPART
Phone #: ###-#### Internet Inspection Request from: Rhonda Yoast
ok to insulate and cover all but area od screen lift. find listing lable and have installation instructions on site for inspector.
ELE09-00168 Permanent Service2/4/20092/4/20092/4/2009 2:49:09 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Rhonda Yoast
P/S U/g N Ok
ELE08-00373 Electrical Rough-In2/4/20092/4/20092/4/2009 1:25:42 PMPPART
john Note: above ceiling Phone #: ###-####
ceilings anop
ELE09-00183 DOC - Permit Finaled2/4/20092/4/20092/4/2009 12:51:10 PMPPASS
ELE09-00109 Electrical Rough-In2/3/20092/4/20092/4/2009 11:36:01 AMAPASS
###-#### Note: if any question give him call since 1/2 commercial / 1/2 residential
ELE08-03239 Conference2/3/20092/4/20092/4/2009 10:04:15 AMAPART
PLease call in the morning to confirm meeting time ###-####. We need to have everything lined up as far as power cut over to not leave the pumping facility without power. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
talked about grounding and clearance
ELE08-03239 Permanent Service2/4/20092/4/20092/4/2009 10:03:42 AMAPASS
PLease call in the morning to confirm meeting time ###-####. We need to have everything lined up as far as power cut over to not leave the pumping facility without power. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
P/S O/H R Ok
ELE09-00181 Permanent Service2/4/20092/4/20092/4/2009 9:31:51 AMACANC
ELE09-00181 Final2/3/20092/4/20092/4/2009 9:31:37 AMAPASS
The actual location of the pump house is on Cartwright road North of the church located at Bogus Basin and Cartwright. The pump house will be on the East just before a fire station. Field contact Dean ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
ELE09-00181 Temporary Service2/4/20092/4/20092/4/2009 9:31:15 AMAPASS
The actual location of the pump house is on Cartwright road North of the church located at Bogus Basin and Cartwright. The pump house will be on the East just before a fire station. Field contact Dean ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
T/S U/G Ok
ELE09-00181 Temporary Service2/4/20092/4/20092/4/2009 9:11:48 AMPCANC
The actual location of the pump house is on Cartwright road North of the church located at Bogus Basin and Cartwright. The pump house will be on the East just before a fire station. Field contact Dean ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
ELE08-02689 Electrical Rough-In2/3/20092/4/20092/4/2009 8:45:32 AMAPASS
###-#### -
told Rick that outside feeder has the same rule as a service for the length of pipe we allow to main disconnect
R/I Ok