ESC08-00971
| Random Inspection | 2/4/2009 | 2/4/2009 | 2/5/2009 4:09:57 PM | P | PASS |
|
|
|
BLD07-01869
| BLD-Conference | 2/3/2009 | 2/4/2009 | 2/5/2009 7:24:39 AM | P | PART |
|
|
patrick Phone #: ###-#### conf on final requirements
|
BLD08-02366
| BLD-Framing/Rough-in | 2/3/2009 | 2/4/2009 | 2/4/2009 3:32:49 PM | P | PART |
|
|
mark Phone #: ###-#### need to add to scope of work,, closing in rear porch, all else ok to insulate
|
BLD08-01684
| BLD-Wall cover | 2/3/2009 | 2/4/2009 | 2/4/2009 2:38:49 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/3/2009 at 10:37:56 AM. Contact: ###-####. energy ok
|
BLD08-02107
| BLD-Energy code compliance | 2/3/2009 | 2/4/2009 | 2/4/2009 1:32:22 PM | A | PART |
|
|
ernie Phone #: ###-#### they added 2 fireplaces after frame and mechanical rough inspections, energy code ok,, ok to cover except by fireplaces,,, need permits for f/p and rough in inspections for both units
|