BLD08-02182
| BLD-Footing | 2/4/2009 | 2/4/2009 | 2/4/2009 4:03:20 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:20:44 AM. Contact: ###-####.
|
ESC08-00872
| Site Preparation | 2/4/2009 | 2/4/2009 | 2/4/2009 4:03:04 PM | P | PART |
|
|
ESC permit sign posted. BMP's in place. Needs to sweep streets gutterpan and sidewalks.
|
BLD08-02183
| BLD-Footing | 2/4/2009 | 2/4/2009 | 2/4/2009 4:02:19 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:21:59 AM. Contact: ###-####.
|
ESC08-00873
| Site Preparation | 2/4/2009 | 2/4/2009 | 2/4/2009 4:02:05 PM | P | PART |
|
|
ESC permit signs posted. BMP's in place. Needs to sweep sidewalks, gutterpan and streets.
|
BLD08-02184
| BLD-Footing | 2/4/2009 | 2/4/2009 | 2/4/2009 4:01:04 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:23:05 AM. Contact: ###-####.
|
ESC08-00874
| Site Preparation | 2/4/2009 | 2/4/2009 | 2/4/2009 4:00:53 PM | P | PART |
|
|
ESC permit signs posted, bMP's in place. Needs to sweep sidewalks, gutterpan and streets.
|
BLD08-02185
| BLD-Footing | 2/4/2009 | 2/4/2009 | 2/4/2009 3:59:42 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:24:30 AM. Contact: ###-####.
|
ESC08-00871
| Site Preparation | 2/4/2009 | 2/4/2009 | 2/4/2009 3:59:30 PM | A | PART |
|
|
ESC permit sign posted, BMP's in place. Needs to sweep sidewalks,gutterpan and streets.
|
ESC08-00873
| Tracking Control | 2/4/2009 | 2/4/2009 | 2/4/2009 3:58:10 PM | P | CANC |
|
|
Wrong insp.
|
BLD08-01656
| BLD-Other | 2/4/2009 | 2/4/2009 | 2/4/2009 2:51:25 PM | P | PART |
|
|
andy Note: ceiling grid Phone #: ###-####. Needs to rpovide assembly from usg for grid under the soffitts.
|
BLD08-01702
| BLD-Aging Inspection | 11/6/2008 | 2/4/2009 | 2/4/2009 9:59:30 AM | A | DONE |
|
|
|
BLD08-01702
| DOC - Permit Finaled | 2/4/2009 | 2/4/2009 | 2/4/2009 9:59:22 AM | P | PASS |
|
|
|
ESC08-01022
| Random Inspection | 2/4/2009 | 2/4/2009 | 2/4/2009 9:31:49 AM | A | PASS |
|
|
|
BLD08-02506
| BLD-Framing/Rough-in | 2/3/2009 | 2/4/2009 | 2/4/2009 9:31:35 AM | A | PASS |
|
|
marvin Phone #: ###-####. All issues resolved.
|
BLD08-02506
| BLD-Energy code compliance | 2/4/2009 | 2/4/2009 | 2/4/2009 9:30:38 AM | A | PASS |
|
|
marvin Phone #: ###-####
|
BLD08-01651
| BLD-Conference | 2/3/2009 | 2/4/2009 | 2/4/2009 9:01:37 AM | A | PASS |
|
|
Mike Phone #: ###-####
|
BLD08-02324
| BLD-Final | 2/3/2009 | 2/4/2009 | 2/4/2009 9:01:18 AM | A | NR |
|
|
tim Phone #: ###-####. Needs plumbing final and zoning final. Contacted Tim to inform him of insp. that were stil needed prior to final.
|