Inspections for the day of: Wednesday, February 4, 2009.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02182 BLD-Footing2/4/20092/4/20092/4/2009 4:03:20 PMPPASS
Scheduled by a contractor via Hello! on 2/4/2009 at 8:20:44 AM. Contact: ###-####.
ESC08-00872 Site Preparation2/4/20092/4/20092/4/2009 4:03:04 PMPPART
ESC permit sign posted. BMP's in place. Needs to sweep streets gutterpan and sidewalks.
BLD08-02183 BLD-Footing2/4/20092/4/20092/4/2009 4:02:19 PMPPASS
Scheduled by a contractor via Hello! on 2/4/2009 at 8:21:59 AM. Contact: ###-####.
ESC08-00873 Site Preparation2/4/20092/4/20092/4/2009 4:02:05 PMPPART
ESC permit signs posted. BMP's in place. Needs to sweep sidewalks, gutterpan and streets.
BLD08-02184 BLD-Footing2/4/20092/4/20092/4/2009 4:01:04 PMPPASS
Scheduled by a contractor via Hello! on 2/4/2009 at 8:23:05 AM. Contact: ###-####.
ESC08-00874 Site Preparation2/4/20092/4/20092/4/2009 4:00:53 PMPPART
ESC permit signs posted, bMP's in place. Needs to sweep sidewalks, gutterpan and streets.
BLD08-02185 BLD-Footing2/4/20092/4/20092/4/2009 3:59:42 PMPPASS
Scheduled by a contractor via Hello! on 2/4/2009 at 8:24:30 AM. Contact: ###-####.
ESC08-00871 Site Preparation2/4/20092/4/20092/4/2009 3:59:30 PMAPART
ESC permit sign posted, BMP's in place. Needs to sweep sidewalks,gutterpan and streets.
ESC08-00873 Tracking Control2/4/20092/4/20092/4/2009 3:58:10 PMPCANC
Wrong insp.
BLD08-01656 BLD-Other2/4/20092/4/20092/4/2009 2:51:25 PMPPART
andy Note: ceiling grid Phone #: ###-####. Needs to rpovide assembly from usg for grid under the soffitts.
BLD08-01702 BLD-Aging Inspection11/6/20082/4/20092/4/2009 9:59:30 AMADONE
BLD08-01702 DOC - Permit Finaled2/4/20092/4/20092/4/2009 9:59:22 AMPPASS
ESC08-01022 Random Inspection2/4/20092/4/20092/4/2009 9:31:49 AMAPASS
BLD08-02506 BLD-Framing/Rough-in2/3/20092/4/20092/4/2009 9:31:35 AMAPASS
marvin Phone #: ###-####. All issues resolved.
BLD08-02506 BLD-Energy code compliance2/4/20092/4/20092/4/2009 9:30:38 AMAPASS
marvin Phone #: ###-####
BLD08-01651 BLD-Conference2/3/20092/4/20092/4/2009 9:01:37 AMAPASS
Mike Phone #: ###-####
BLD08-02324 BLD-Final2/3/20092/4/20092/4/2009 9:01:18 AMANR
tim Phone #: ###-####. Needs plumbing final and zoning final. Contacted Tim to inform him of insp. that were stil needed prior to final.