Inspections for the day of: Thursday, February 4, 2010.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 General Inspection2/4/20102/4/20102/4/2010 2:49:04 PMPPART
Verbal to RP: Sediment barrier at entrance (protection across Wallings Creek ) is in need of maintaining. Observed willow plantings along the river, looks good, plantings are on an appro. 4' spacing. West side excavation of waste materials is continuing.
ESC09-00812 Site Preparation2/4/20102/4/20102/4/2010 2:00:56 PMPNR
Work has not commenced but I did leave the RP a voice mail regarding the responsibility to control any sub-contractors including utility contractors. Also, requested the RP return my call so a brief discussion over the outfall and the intentions of plugging this prior to starting the water transfer and to discuss the type of liner they intend to use for lining the water transfer ditch. More of a conference then a site preparation inspection.
ESC09-00286 General Inspection2/4/20102/4/20102/4/2010 1:54:45 PMPFAIL
Entrance into the work area where pump and front end loader is located next to the basin needs filter fabric and wash rock to reduce trackout. Complete entrance within two working days.
ESC10-00010 General Inspection2/4/20102/4/20102/4/2010 1:52:36 PMPPART
Verbal to RP, Randy, need to maintain construction entrance. Complete within two working days. No other activity observed.