ESC09-00352
| General Inspection | 2/4/2010 | 2/4/2010 | 2/4/2010 2:49:04 PM | P | PART |
|
|
Verbal to RP: Sediment barrier at entrance (protection across Wallings Creek ) is in need of maintaining. Observed willow plantings along the river, looks good, plantings are on an appro. 4' spacing. West side excavation of waste materials is continuing.
|
ESC09-00812
| Site Preparation | 2/4/2010 | 2/4/2010 | 2/4/2010 2:00:56 PM | P | NR |
|
|
Work has not commenced but I did leave the RP a voice mail regarding the responsibility to control any sub-contractors including utility contractors. Also, requested the RP return my call so a brief discussion over the outfall and the intentions of plugging this prior to starting the water transfer and to discuss the type of liner they intend to use for lining the water transfer ditch. More of a conference then a site preparation inspection.
|
ESC09-00286
| General Inspection | 2/4/2010 | 2/4/2010 | 2/4/2010 1:54:45 PM | P | FAIL |
|
|
Entrance into the work area where pump and front end loader is located next to the basin needs filter fabric and wash rock to reduce trackout. Complete entrance within two working days.
|
ESC10-00010
| General Inspection | 2/4/2010 | 2/4/2010 | 2/4/2010 1:52:36 PM | P | PART |
|
|
Verbal to RP, Randy, need to maintain construction entrance. Complete within two working days. No other activity observed.
|