BLD09-02149
| FIRE-Final Inspection | 2/4/2010 | 2/4/2010 | 2/4/2010 3:56:31 PM | P | PASS |
|
|
Life safety passed
|
FIR10-00025
| INSP-Final Inspection | 2/3/2010 | 2/4/2010 | 2/4/2010 3:30:50 PM | P | PASS |
|
|
Permit finaled
|
FIR09-00423
| INSP-Conference | 2/4/2010 | 2/4/2010 | 2/4/2010 3:27:48 PM | P | DONE |
|
|
Meeting the fire alarm contractor in the morning to verify the hood suppresion system interconnection.
|
BLD10-00014
| FIRE-Final Inspection | 2/3/2010 | 2/4/2010 | 2/4/2010 1:27:19 PM | P | PASS |
|
|
Life safety passed
|
FIR09-00352
| INSP-Final Inspection | 2/3/2010 | 2/4/2010 | 2/4/2010 1:26:53 PM | P | PASS |
|
|
Permit finaled. Netcon was 5.
|
FIR09-00723
| INSP-Final Inspection | 2/3/2010 | 2/4/2010 | 2/4/2010 10:35:47 AM | A | FAIL |
|
|
No testing was performed since an additional horn/strobe was not installed as required by the resubmitted plans. Also the manual pull station, at the west exit, that was shown to be relocated exceeds 48" above the finish floor. Since this device has been modified it needs to meet the current code mounting heights. All other a/v's seem to be installed correctly. The devices were not tested for function or EOL verified.
|
BLD09-01836
| FIRE-Final Inspection | 2/3/2010 | 2/4/2010 | 2/4/2010 8:40:34 AM | A | PASS |
|
|
Life safety passed.
|