Inspections for the day of: Monday, February 4, 2013.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-01119 Site Preparation1/30/20132/4/20132/7/2013 11:41:51 AMAPART
Verbal to RP;
providde a sediment brrier alond access by the end of work day.
ESC12-01224 Site Preparation2/4/20132/4/20132/5/2013 9:28:06 AM PASS
ESC12-00812 General Inspection2/4/20132/4/20132/4/2013 2:40:33 PM DONE
Permit finaled.
ESC12-00812 DOC - Permit Finaled2/4/20132/4/20132/4/2013 2:40:13 PMPPASS
ESC12-00972 General Inspection1/30/20132/4/20132/4/2013 2:40:04 PMAPASS
ESC12-01176 BMP Violation2/4/20132/4/20132/4/2013 2:39:55 PMPFAIL
Correction notice Posted; (Verbal to RP)
1. Install sediment barrier along the east section of the project area.
Re-install sediment barriers where installed incorrectly or delopidated on the south section of the project area. Will re-inspect on 2/5/2013 PM
ESC12-01054 BMP Violation2/4/20132/4/20132/4/2013 2:10:27 PMPPASS
ESC12-00131 General Inspection2/4/20132/4/20132/4/2013 1:47:24 PM FAIL
Verbal to RP (oliver w/ Steed Cont.)
Provide a stabilized construction exit going out to Cloverdale. Will re-inspect on 2/7/2013
ESC12-00560 General Inspection2/4/20132/4/20132/4/2013 1:23:20 PM NR
NO activity
ESC12-01169 Site Preparation2/4/20132/4/20132/4/2013 1:22:24 PM NR
ESC13-00001 Site Preparation2/4/20132/4/20132/4/2013 1:21:58 PM FAIL
Must provide a concrete washout and storm drain inlet protection. Explained to contractor that he can use a product to seal the storm drains during the work day and remove them at the end of the day.
ESC12-01191 Site Preparation2/4/20132/4/20132/4/2013 9:27:39 AM NR
ESC11-00874 General Inspection2/4/20132/4/20132/4/2013 9:13:53 AM FAIL
Correction Notice Posted; (Verbal To RP)
1. CLean up all sediment and debris off of all hard surfaces through out the construction project area.
2. Remove all trash debris piles through out all construction areas.
3. Provide sediment barriers where there is a potental for run off from the disturbed areas.
4. Maintain all storm drain inlets.
Will re-inspect on 2/6/20112 PM