Inspections for the day of: Tuesday, February 4, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00918 General Inspection2/4/20142/4/20142/4/2014 11:42:33 AM PASS
Stockpile remaining onsite and surrounded by trenched in silt fence. No corrections required. No track out to Orion observed. Some sand on street for winter road safety.
ESC13-00773 General Inspection2/4/20142/4/20142/4/2014 11:03:33 AM PASS
Elevation Ridge townhome construction in compliance.
ESC13-00774 General Inspection2/4/20142/4/20142/4/2014 11:03:01 AM PASS
Elevation Ridge townhome construction in compliance.
ESC13-00292 Aging Inspection2/4/20142/4/20142/4/2014 10:53:08 AM PASS
Finaled.
ESC13-00292 DOC - Permit Finaled2/4/20142/4/20142/4/2014 10:52:56 AMPPASS
House complete and landscaped. BLD permits finaled. ESC permit conditions satisfied.
ESC13-00730 Aging Inspection2/4/20142/4/20142/4/2014 10:28:26 AM PASS
Finaled.
ESC13-00730 DOC - Permit Finaled2/4/20142/4/20142/4/2014 10:26:58 AMPPASS
RV cover is installed. Yard is re-stabilized. No construction materials left on site. No futher ESC inspections required. No activity on BLD since July 2013.
ESC13-00128 Aging Inspection2/4/20142/4/20142/4/2014 10:03:10 AM PART
No trackout onto street or discharges. Frame is built but project is not complete. Some dirt on sidewalk from landscaping or utility work needs to be swept. Notified RP Travis via phone to sweep up ASAP.
ESC13-00339 General Inspection2/4/20142/4/20142/4/2014 9:34:45 AM PASS
No activity at time of inspection. The rear portion of parking lot is not complete. Curbing and stormwater swales are protecting 10-Mile Creek. No corrections at this time.
ESC13-00482 General Inspection2/4/20142/4/20142/4/2014 9:19:20 AM PASS
Finaled.
ESC13-00482 DOC - Permit Finaled2/4/20142/4/20142/4/2014 9:18:58 AMPPASS
Foundation for building has been completed and BLD permit finaled. Parking lot is poured and in use. Multiple other ESC permits open for Union Square so project will continue to have routine inspections. Approved.
ESC13-00481 General Inspection2/4/20142/4/20142/4/2014 9:15:27 AM PASS
Road appears to be swept over weekend and construction entrance to staging area has new construction entrance. No corrections at this time. WIP.