ESC13-00918
| General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 11:42:33 AM | | PASS |
|
|
Stockpile remaining onsite and surrounded by trenched in silt fence. No corrections required. No track out to Orion observed. Some sand on street for winter road safety.
|
ESC13-00773
| General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 11:03:33 AM | | PASS |
|
|
Elevation Ridge townhome construction in compliance.
|
ESC13-00774
| General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 11:03:01 AM | | PASS |
|
|
Elevation Ridge townhome construction in compliance.
|
ESC13-00292
| Aging Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 10:53:08 AM | | PASS |
|
|
Finaled.
|
ESC13-00292
| DOC - Permit Finaled | 2/4/2014 | 2/4/2014 | 2/4/2014 10:52:56 AM | P | PASS |
|
|
House complete and landscaped. BLD permits finaled. ESC permit conditions satisfied.
|
ESC13-00730
| Aging Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 10:28:26 AM | | PASS |
|
|
Finaled.
|
ESC13-00730
| DOC - Permit Finaled | 2/4/2014 | 2/4/2014 | 2/4/2014 10:26:58 AM | P | PASS |
|
|
RV cover is installed. Yard is re-stabilized. No construction materials left on site. No futher ESC inspections required. No activity on BLD since July 2013.
|
ESC13-00128
| Aging Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 10:03:10 AM | | PART |
|
|
No trackout onto street or discharges. Frame is built but project is not complete. Some dirt on sidewalk from landscaping or utility work needs to be swept. Notified RP Travis via phone to sweep up ASAP.
|
ESC13-00339
| General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 9:34:45 AM | | PASS |
|
|
No activity at time of inspection. The rear portion of parking lot is not complete. Curbing and stormwater swales are protecting 10-Mile Creek. No corrections at this time.
|
ESC13-00482
| General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 9:19:20 AM | | PASS |
|
|
Finaled.
|
ESC13-00482
| DOC - Permit Finaled | 2/4/2014 | 2/4/2014 | 2/4/2014 9:18:58 AM | P | PASS |
|
|
Foundation for building has been completed and BLD permit finaled. Parking lot is poured and in use. Multiple other ESC permits open for Union Square so project will continue to have routine inspections. Approved.
|
ESC13-00481
| General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 9:15:27 AM | | PASS |
|
|
Road appears to be swept over weekend and construction entrance to staging area has new construction entrance. No corrections at this time. WIP.
|