FIR14-00437
| INSP-Sprinkler Rough-in | 2/3/2015 | 2/4/2015 | 2/4/2015 3:40:56 PM | P | PART |
|
|
Begin 24 hr air test of the new dry system at 43psig @ 3:15PM.
|
BLD15-00118
| FIRE-Conference | 2/4/2015 | 2/4/2015 | 2/4/2015 3:05:56 PM | P | DONE |
|
|
On site conference regarding requirements per IFC and IBC related to egress doors equipped with mag lock hardware including; EM lighting, relay to release upon fire alarm or power loss, occ sensor, request to exit button. Also discussed exit signage and locations of fire sprinkler and occupant notification coverage.
|
FIR14-00683
| INSP-Sprinkler Rough-in | 2/4/2015 | 2/4/2015 | 2/4/2015 12:08:13 PM | A | PART |
|
|
Verification of previous C/N items for completion.
|
FIR14-00900
| INSP-Final Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 12:06:35 PM | A | PASS |
|
|
Scope of work completed. Fire sprinker permit finaled.
|
FIR14-00531
| INSP-Sprinkler Rough-in | 2/4/2015 | 2/4/2015 | 2/4/2015 12:05:44 PM | A | PART |
|
|
Completed rough-in inspection for the 5th floor tower 2 living units and common corridor. Also okayed for cover drops at lower soffits 4th floor tower 1.
|