FIR16-00048
| INSP-Final Inspection | 2/2/2016 | 2/4/2016 | 2/4/2016 3:22:01 PM | P | CANC |
|
|
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by Talk with Jim after 4pm
|
FIR15-00892
| INSP-Sprinkler Rough-in | 2/4/2016 | 2/4/2016 | 2/4/2016 2:49:08 PM | P | PART |
|
|
Rough-in passed for what is shown on the plans. See plans for several locations where small corrections are required. Piping can not be covered until I have access into the the upper overbuild and the enclosed front canopy to perform inspection and speak to the plan reviewer.
|
BLD16-00174
| FIRE-Alarm Testing | 2/4/2016 | 2/4/2016 | 2/4/2016 2:06:28 PM | A | CANC |
|
|
To be rescheduled for tomorrow
|
BLD16-00173
| FIRE-Alarm Testing | 2/4/2016 | 2/4/2016 | 2/4/2016 2:05:51 PM | A | CANC |
|
|
Rescheduled for tomorrow
|
ESC15-00720
| Random Inspection | 2/4/2016 | 2/4/2016 | 2/4/2016 2:01:41 PM | P | PART |
|
|
Raining day. I noted some track out from job site and from the neighboring lot onto the street. Appears storm drain sediment protection is missing. Notified Andy.
|
FIR15-00662
| INSP-Alarm Testing | 2/3/2016 | 2/4/2016 | 2/4/2016 10:37:44 AM | A | CANC |
|
|
The contact is Cody from Biltmore. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR16-00061
| INSP-Final Inspection | 2/3/2016 | 2/4/2016 | 2/4/2016 10:35:36 AM | A | CANC |
|
|
Peter Phone #: ###-####
|
BLD15-00245
| FIRE-Final Inspection | 2/3/2016 | 2/4/2016 | 2/4/2016 10:34:09 AM | A | FAIL |
|
|
life safety will be ok to pass when sprinkler and alarms are complete.
|
BLD15-03315
| FIRE-Final Inspection | 2/2/2016 | 2/4/2016 | 2/4/2016 10:31:29 AM | A | FAIL |
|
|
Provide single action hardware for Door 111A , provide exit discharge light at south exit door, provide correct remote annunciators for the duct smoke detectors and test. Mechanical inspector approved pizza ovens not to be type 1.
|
BLD15-04250
| FIRE-Final Inspection | 2/3/2016 | 2/4/2016 | 2/4/2016 8:33:35 AM | A | PASS |
|
|
life safety passed
|
FIR16-00001
| INSP-Final Inspection | 2/3/2016 | 2/4/2016 | 2/4/2016 7:37:30 AM | A | PASS |
|
|
Permit finaled
|