ELE19-00404
| Final | 2/4/2019 | 2/4/2019 | 2/4/2019 2:34:25 PM | P | PASS |
|
|
call 30 mins ahead- Mitch Phone #: ###-#### Final ok
|
ELE19-00404
| Electrical Rough-In | 2/4/2019 | 2/4/2019 | 2/4/2019 1:24:09 PM | P | PASS |
|
|
call 30 mins ahead- Mitch Phone #: ###-#### Rough in ok
|
ELE19-00349
| Electrical Rough-In | 2/1/2019 | 2/4/2019 | 2/4/2019 1:10:31 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley Spoke to builder, Recep will be added within 25ft of A/C before final Whole house rewire. Not all walls opened in Bed and living. Kitchen and laundry stipped to studs. Rough in ok
|
ELE19-00039
| Rough-In Permanent Service | 2/1/2019 | 2/4/2019 | 2/4/2019 12:23:39 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rowdy Monroe rough in ok p/s u/g n ok
|
ELE18-00250
| Final | 2/4/2019 | 2/4/2019 | 2/4/2019 10:55:54 AM | P | CANC |
|
|
Greg Phone #: ###-####
|
ELE18-00250
| Conference | 2/4/2019 | 2/4/2019 | 2/4/2019 10:55:13 AM | P | PASS |
|
|
Greg Phone #: ###-#### Talked about wiring of instahot in conduit using #6 thhn the owner has onsite, prewire only for future ADU,wire support, nailplates, and when to call for rough in inspection, Owner hasnt worked on project for over a year. Has had Permanent service inspection and can call for power.
|
ELE18-00250
| Conference | 1/30/2019 | 2/4/2019 | 2/4/2019 9:53:07 AM | A | CANC |
|
|
Greg Phone #: ###-####
|
ELE19-00388
| Electrical Rough-In | 2/1/2019 | 2/4/2019 | 2/4/2019 9:39:37 AM | A | PASS |
|
|
Kitchen RI inspection. Call Zach if not on site. Homeowner knows you will be coming. Phone #: ###-#### Inspection requested via web by Garrett Collins Kitchen only ok to cover
|
ELE18-04277
| Electrical Rough-In | 2/1/2019 | 2/4/2019 | 2/4/2019 9:11:43 AM | A | FAIL |
|
|
Need ok to cover Phone #: ###-#### Inspection requested via web by David Green 210.52 C Recep needed within 24rin of sink(RT side) 334 NM cable shall be supported within 12in of box.(Below panel) Abandoned wire in master bed needs removed
|