FIR18-00610
| INSP-Sprinkler Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 3:36:29 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping located above the hardlids in restrooms on level 3 complete, level 3 restrooms approved for cover.
Rough to cover third floor Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
FIR18-00908
| INSP-Sprinkler Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 2:51:12 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping lovcated above hardlids complete, hardlids approved for cover.
Rudy Phone #: ###-####
|
FIR18-00906
| INSP-Sprinkler Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 2:13:09 PM | P | PART |
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, overehad fire sprinkler piping installed between conditioned spaces approved for cover, piping in attic spaces requiring tenting not approved for cover until a tenting inspection is performed and approved for cover.
|
FIR18-00906
| INSP-Sprinkler Rough-in/Hydro | 2/1/2019 | 2/4/2019 | 2/4/2019 2:10:47 PM | P | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00012
| INSP-Sprinkler Rough-in/Hydro | 2/4/2019 | 2/4/2019 | 2/4/2019 1:36:35 PM | P | PART |
|
|
24 hour air test started at 1PM with 41 psi on new piping.
24hr air test Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
FIR18-00814
| INSP-Supply line flush | 2/1/2019 | 2/4/2019 | 2/4/2019 11:03:19 AM | A | DONE |
|
|
Underground supply flush witnessed.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00519
| INSP-Supply line flush | 2/1/2019 | 2/4/2019 | 2/4/2019 10:43:36 AM | P | FAIL |
|
|
Could not complete flush, underground valves were not accessable at time that flush could be completed due to dirt cover/bent valve box.
Underground hydro/flush Gabriel Garduno is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00562
| INSP-Supply line flush | 2/1/2019 | 2/4/2019 | 2/4/2019 10:43:19 AM | P | FAIL |
|
|
Could not complete flush, underground valves were not accessable at time that flush could be completed due to dirt cover/bent valve box.
Underground hydro/flush Gabriel Garduno is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-01031
| FIRE-Final Inspection | 2/1/2019 | 2/4/2019 | 2/4/2019 8:57:49 AM | A | PART |
|
|
Partial final inspection for life fire safety complete, patio attached to waiting room is to remain locked with no occupancy allowed on patio until notification is installed. Permit can be finaled for life fire safety after fire alarm notification is installed and associated FIR permit for fire alarms is complete.
Stan Phone #: ###-####
|
BLD16-02008
| FIRE-Final Inspection | 2/1/2019 | 2/4/2019 | 2/4/2019 8:49:42 AM | A | PASS |
|
|
Final pahse 5 for project complete, final inspection for life fire safety complete.
Phase 5 TCO Plan, Final inspection of Phase 5 roof patio. Call Adam before heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIR16-00563
| INSP-Final Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 8:48:14 AM | A | PASS |
|
|
Final fire sprinkler inspection complete.
|
BLD18-03949
| FIRE-Final Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 8:45:26 AM | P | PASS |
|
|
Inspection request cancelled per conversation with point of contact, will be rescheduled for a later date.
Dustin Phone #: ###-####
|
FIR18-00209
| INSP-Final Inspection | 2/1/2019 | 2/4/2019 | 2/4/2019 8:26:09 AM | A | PASS |
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|