BLD00-01563
| BLD-Wall cover | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 06:49:54. Contact: ###-####.
|
BLD01-00239
| BLD-Conference | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | PART |
|
|
Louie ###-#### This permit has not been picked up yet is this conference all right? demo complet work in progess pending planreview approval before framing insp. existing fire wall apears ok. 2 hr. 2/5/2001 2:42:02 PM
|
BLD00-02899
| BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | PART |
|
|
###-#### ceilling ok for cover./ c/n 3 idems head height on north stair with strucral details to support floor. landins at exterior on exit doors./ arch to submit delation of store front fron scope of work to be archived. 2/5/2001 10:07:04 AM
|
BLD00-01563
| BLD-Concrete | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 06:44:16. Contact: ###-####. Scheduled by a placed with special insp. pending report.contractor via Hello! on 02/05/2001 at 06:44:16. Contact: ###-####. 2/5/2001 6:11:39 PM
|
BLD99-01623
| BLD-Final | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PASS |
|
|
###-#### ok pending code enforcment 2/5/2001 2:07:36 PM
|
BLD99-02805
| BLD-Final | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PASS |
|
|
ok pending p&z for perm. 2/5/2001 2:08:11 PM
|
BLD00-01261
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PASS |
|
|
###-#### ceilling ok for cover. 2/6/2001 8:57:24 AM
|
BLD00-02920
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 301 On 2/5/2001 10:20:35 PM c/n isued 1# 307.1.4 h-3 area over 150 sq/ft required to have min 2 hr wall. aproved plan has a 1 hr wall designation a3.6/e&k27a refrance to floor plan 2.0.3 at grid lines a9 - c8 and 27 - 30.
2# doors in these walls requied to be 1 1/2 hr rated.
3# chemical exsust duct passing from one h-3 occ to h-6 occ and into another h-3 occ rm. will need to be protected to meet ubc 1202.2.5 2hr protection.
4# walls 28/c2,c8 and 29/c2.c8 struc. I beam restricks 2hr wall configration for gyp. attchament provide wall and listing design.
5# bottom fo beams on grid line c2 and c8 missing 1 layer of gyp. protection.
6#I beams perpendickular to 2hr and 1 hr walls requier wall stud framing into web for screw sch. of listing for gyp. atchment.
7# bottom track pin to slab and track to gyp. must be per plan and gyp. assemblie listing.
8#fab ground level walls at grid line c2 and 29 must have detail submitted for collums incapsaluated with in the 1hr corridor assemblie this is a full height wall struc. frame conections and deflection for height to be addressed.
9# ele. boxes less than 24 inches must be procted two locations 2hr walls basement.
10# all trades must submit fire stopping listings to address there idems for insp.
11#fab wall must have horrisontal bar for steel stud framing height of wall.
|
BLD00-02920
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 301 On 2/5/2001 9:45:21 PM recieved resubmital for top of the wall head-joint to replace the approved plan detail and listing on 3.6 / 3.6.1 . listed ul/cul no.hw-d-0077system #. this listing is april 21, 2000 and meets the new std. for fire stopping as a class II movement capabilies = 17% comp or extention. submital approved and archived to documents with city plan.
|