BLD00-03442
| BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 12:38:01. Contact: . ok to insulate, Truss A-3,4,5, engineer required, 2/5/2001 12:42:32 PM
|
BLD00-03440
| BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 12:39:07. Contact: .
|
BLD00-03559
| BLD-Energy code compliance | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | PASS |
|
|
Tim Wilson ###-####
|
BLD00-03638
| BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 15:05:21. Contact: ###-####.c/n issued, straps on header in family room, air seal package needed, solid bearing or engineering on 2 ply beams at porch. 2/5/2001 9:42:34 AM
|
MEC01-00223
| Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 15:35:29. Contact: ###-####.
|
MEC01-00327
| Final | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 06:00:04. Contact: ###-####.
|
BLD00-03638
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 11:03:02. Contact: . Prior mechanical correction notice item needed 2/5/2001 2:05:32 PM
|
BLD00-03565
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PART |
|
|
###-#### ok to side except garage front, nailing with 8d at 2" and 12" oc per plans. 2/5/2001 1:34:38 PM
|
BLD00-03144
| BLD-Foundation | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 420 On 2/5/2001 1:44:33 PM
|
BLD00-02647
| BLD-Other | 2/4/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/04/2001 at 22:26:19. Contact: ###-####. Re-inspection of pharmacy suspended ceiling. 2/5/2001 3:23:46 PM
|
BLD00-03651
| BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | NR |
|
|
Chris ###-#### late pm. Mechanical and electrical rough in inspections needed prior to framing. 2/5/2001 2:34:07 PM
|