Inspections for the day of: Monday, February 5, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01375 BLD-Final2/2/20012/5/20012/5/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/02/2001 at 13:03:30. Contact: ###-####. need tempered glass ground floor master bed rm 2/5/2001 12:10:48 PM
BLD01-00108 BLD-Framing/Rough-in2/2/20012/5/20012/5/2001 12:00:00 AMAFAIL
dan ###-#### 2/5/2001 12:09:57 PM need mec elec plu rough ins ok to insulate 2/5/2001 12:11:54 PM
BLD00-03706 BLD-Framing/Rough-in2/5/20012/5/20012/5/2001 12:00:00 AMPFAIL
Matt, ###-#### : ) need city apr plans and pluming rough in 2/5/2001 2:51:47 PM
BLD01-00179 BLD-Foundation2/5/20012/5/20012/5/2001 12:00:00 AMPPART
###-#### crew is still setting form checked set backs no prob 2/5/2001 3:09:57 PM
BLD00-03703 BLD-Framing/Rough-in2/5/20012/5/20012/5/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 2/5/2001 4:46:05 PM shear pannel
BLD00-02423 BLD-Framing/Rough-in2/5/20012/5/20012/5/2001 12:00:00 AMPFAIL
Added by Inspector: 425 On 2/5/2001 4:55:55 PM need engineering on doorway in cmu wall between dinning rooms on roof for added mec resubmit plans showing all new room layouts rough framing on restrooms and wall between kitchen and dinning room is ok sepperation wall on east end needs to be built as per plans mec is being redesgned and elec is being checked wall may need tobe opened up
BLD00-03703 BLD-Framing/Rough-in2/1/20012/5/20012/5/2001 12:00:00 AMPPART
Chuck ###-#### c/n on site ok to insulate after
they get a mec rough in 2/5/2001 4:45:27 PM
BLD00-03700 BLD-Framing/Rough-in2/1/20012/5/20012/5/2001 12:00:00 AMPPART
Chuck ###-#### c/n on site ok to insulate 2/5/2001 3:55:29 PM