BLD00-01375
| BLD-Final | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 13:03:30. Contact: ###-####. need tempered glass ground floor master bed rm 2/5/2001 12:10:48 PM
|
BLD01-00108
| BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | A | FAIL |
|
|
dan ###-#### 2/5/2001 12:09:57 PM need mec elec plu rough ins ok to insulate 2/5/2001 12:11:54 PM
|
BLD00-03706
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | FAIL |
|
|
Matt, ###-#### : ) need city apr plans and pluming rough in 2/5/2001 2:51:47 PM
|
BLD01-00179
| BLD-Foundation | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PART |
|
|
###-#### crew is still setting form checked set backs no prob 2/5/2001 3:09:57 PM
|
BLD00-03703
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 425 On 2/5/2001 4:46:05 PM shear pannel
|
BLD00-02423
| BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 425 On 2/5/2001 4:55:55 PM need engineering on doorway in cmu wall between dinning rooms on roof for added mec resubmit plans showing all new room layouts rough framing on restrooms and wall between kitchen and dinning room is ok sepperation wall on east end needs to be built as per plans mec is being redesgned and elec is being checked wall may need tobe opened up
|
BLD00-03703
| BLD-Framing/Rough-in | 2/1/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PART |
|
|
Chuck ###-#### c/n on site ok to insulate after
they get a mec rough in 2/5/2001 4:45:27 PM
|
BLD00-03700
| BLD-Framing/Rough-in | 2/1/2001 | 2/5/2001 | 2/5/2001 12:00:00 AM | P | PART |
|
|
Chuck ###-#### c/n on site ok to insulate 2/5/2001 3:55:29 PM
|