Inspections for the day of: Tuesday, February 5, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03361 BLD-Framing/Rough-in2/4/20022/5/20022/8/2002 12:00:00 AMAPART
Scheduled by Inspector: 340 On 2/4/2002 4:33:01 PM wendell ###-####...wip, keep c/n, complete firestops; need eng's ok for c/o 2/8/2002 4:38:46 PM
BLD00-03361 BLD-Conference2/5/20022/5/20022/6/2002 12:00:00 AMPPASS
Scheduled by Inspector: 340 On 2/5/2002 5:57:17 PM wendell ###-####, w/ Ziggy, plbg ok 2/7/2002 9:22:23 AM
BLD01-03031 BLD-Final2/4/20022/5/20022/5/2002 12:00:00 AMAPASS
###-#### MIKE
BLD01-01560 BLD-Conference2/5/20022/5/20022/5/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/5/2002 10:33:16 AM firestopping, prior c/n w/ Tony & Joel at site
BLD01-00252 BLD-Final2/5/20022/5/20022/5/2002 12:00:00 AMAPASS
All other trades signed off on card. 325...c/ n ok 2/5/2002 11:43:21 AM
BLD01-02425 BLD-Conference2/5/20022/5/20022/5/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/5/2002 11:36:51 AM w/ framer re c/n...complete eng'd shear panels & fireblocks
BLD01-01030 BLD-Conference2/5/20022/5/20022/5/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 2/5/2002 2:44:29 PM w/ hosac...boss will be gone til 2-22; bring plans docs asap
BLD99-03148 BLD-Conference2/5/20022/5/20022/5/2002 12:00:00 AMPPASS
Scheduled by Inspector: 340 On 2/5/2002 11:21:08 AM ...w/ Rick re fire final... Brett, need all finals incl plbg, hvac. 2/5/2002 5:55:53 PM
BLD00-02175 BLD-Final2/4/20022/5/20022/5/2002 12:00:00 AMPNR
christina-- ###-#### fn occ
BLD02-00158 BLD-Conference2/5/20022/5/20022/5/2002 12:00:00 AMPPASS
darren ###-#### for a conf , make excav...call for insp. 2/5/2002 5:50:20 PM
BLD01-03227 BLD-Conference2/5/20022/5/20022/5/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 2/5/2002 5:59:15 PM exit sign to be moved over entry