MIS02-00020
| BLD-Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
Roger, ###-####, ###-#### Pending fire/life safety. 2/5/2002 1:19:33 PM
|
MIS02-00019
| BLD-Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
Roger, ###-#### or ###-#### Pending fire /life safety. 2/5/2002 1:19:46 PM
|
BLD01-03178
| BLD-Energy code compliance | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 09:19:35. Contact: ###-####.c/n for shower. 2/5/2002 11:17:58 AM
|
BLD01-02626
| BLD-Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
###-#### LINDA Ok subject to electrical. 2/5/2002 11:18:25 AM
|
BLD01-00729
| BLD-Framing/Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
###-#### went over roof trusses all ok except 1 truss at east end. The 4th floor still needs the area separation wall ele boxes paded and penetrations done note this wall has been insulated and drywalled. also there are pvc plumbing penetration which will be relocated and will need verification of protection. The 3rd floor can be insulated but has the same problem with the area separation walls and pvc flue pipes,also shear walls are not complete and rest room ceilings will need to be inspected prior to the drop celings being put in. See also bld 01-00737,01-00736. 2/5/2002 4:27:20 PM 2/5/2002 4:29:36 PM
|
BLD01-00737
| BLD-Framing/Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 2/5/2002 4:27:55 PM see bld01-00729 2/5/2002 4:31:53 PM
|
BLD01-00736
| BLD-Framing/Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 2/5/2002 4:28:26 PM see bld01-00729 2/5/2002 4:31:43 PM
|
BLD01-01684
| BLD-Final | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | PASS |
|
|
22-9098 Ok for permanent oc. 2/5/2002 4:19:43 PM
|
BLD01-02651
| BLD-Framing/Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | PART |
|
|
###-####. Insulation and 1 st layer 3/4 in drywall at 4 hr area separation. 2/5/2002 4:04:49 PM
|
MEC01-03617
| Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 11:54:10. Contact: ###-####. Ok perm oc.2/5/2002 4:05:02 PM c. 2/5/2002 4:05:04 PM 2/5/2002 4:05:15 PM
|