BLD02-00148
| BLD-Footing | 2/1/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
jay ###-#### ft wip--80% ready at time of inspection. 2/5/2002 10:09:27 AM
|
BLD01-03085
| BLD-Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PASS |
|
|
###-#### call for access c. of c. #22152 issued. 2/5/2002 8:36:24 AM
|
BLD01-02814
| BLD-Framing/Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PASS |
|
|
SHEER NAIL RICK - ###-#### SHEAR--OK TO SIDE 2/5/2002 9:30:07 AM
|
BLD01-02987
| BLD-Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PASS |
|
|
GEORGE - ###-####
|
BLD02-00115
| BLD-Foundation | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 06:52:06. Contact: ###-####. WIP--15% ready at time of inspection--talked to builder--Canyon--per plan reviewer--stamped eng. needed for major point load in garage--to be faxed to me. 2/5/2002 9:44:04 AM
|
MEC02-00149
| Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 07:37:03. Contact: ###-####. c/n posted--Pressure test ok--exhaust fans needed throughout--insulate all the way to fan housing--16 penny nails at strap cover gas pipe in garage. 2/5/2002 2:05:46 PM
|
BLD01-01668
| BLD-Other | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | PASS |
|
|
ED - ###-#### Bldg. # 4--Inside of 1-Hr fire wall. 2/5/2002 1:31:42 PM
|
BLD02-00193
| BLD-Footing | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | PART |
|
|
###-#### wip--80% ready at time of inspection. 2/5/2002 2:22:15 PM
|
BLD02-00145
| BLD-Footing | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | FAIL |
|
|
jake-- ###-#### ft Setback on front north not per approved plans. 2/5/2002 3:00:22 PM
|
BLD02-00142
| BLD-Footing | 2/5/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | PART |
|
|
jake ###-#### ft insp wip-10% at time of inspection 2/5/2002 2:59:30 PM
|
BLD02-00193
| BLD-Footing | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | NR |
|
|
###-#### JACK
|
MEC02-00307
| Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | PART |
|
|
###-#### A-1 ANDERIA Contractor to soap test existing gas lines. 2/5/2002 1:31:14 PM
|
BLD01-02405
| BLD-Final | 2/4/2002 | 2/5/2002 | 2/5/2002 12:00:00 AM | P | CANC |
|
|
###-#### allan fn occ---cancel per betty
|