BLD00-03428
| BLD-Framing/Rough-in | 1/30/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | A | FAIL |
|
|
calvin-fire caulking for ceiling; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie basement fire stopping not instaled per the listing on insulated pipes min 1/2 to 1 1/2 with 5/8 depth and 1/4 bead. other penatrations not complet through out. wall continuity must be maintaned. 2/5/2003 9:41:04 AM
|
BLD03-00121
| BLD-Final | 2/4/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-02736
| BLD-Framing/Rough-in | 2/4/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | A | PART |
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs 2x12 top of hand stack not done. 2/5/2003 3:16:56 PM
|
MIS03-00020
| BLD-Conference | 2/4/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | A | PASS |
|
|
Rehab request for housing code. Specific issue is condition of wood foundation. Contact Connie @ ###-#### for access key. Any questions contact Bob A. form with connie 2/6/2003 3:04:56 PM
|
BLD01-01746
| BLD-Final | 2/4/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | A | DONE |
|
|
###-#### DAVE ###-#### DAVE ubc106.4.4 talked to bob a for diraction with action. 2/7/2003 9:35:08 AM
|
BLD02-02787
| BLD-Framing/Rough-in | 2/4/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/04/2003 at 21:04:12. Contact: ###-####.c/n ok recieved repairs from truss mfg. apear to be instaled per engering. 2/5/2003 3:01:55 PM
|
BLD02-02927
| BLD-Wall cover | 2/4/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | P | PART |
|
|
nailling not complet ok to start soffit/facia only/ sill plate and butt joints to be re-inspcted.exterior ok for cover. 2/5/2003 2:48:04 PM
|
BLD02-02498
| BLD-Final | 2/4/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD02-02863
| BLD-Footing | 1/30/2003 | 2/5/2003 | 2/5/2003 12:00:00 AM | P | PART |
|
|
###-#### placed with special insp. 2/5/2003 4:06:48 PM
|