Inspections for the day of: Wednesday, February 5, 2003.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02068 BLD-Framing/Rough-in2/4/20032/5/20032/5/2003 12:00:00 AMACANC
nailing insp--craig; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie will rewcall for pm out of time. 2/5/2003 11:18:06 AM
BLD02-02897 BLD-Final2/4/20032/5/20032/5/2003 12:00:00 AMAPART
###-####. Would be ok for a permanent oc , If signed off by fire/life safety. All other required signatures are on card. 2/5/2003 9:42:53 AM
BLD02-02850 BLD-Energy code compliance2/4/20032/5/20032/5/2003 12:00:00 AMAPASS
JAY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD02-02166 BLD-Framing/Rough-in2/4/20032/5/20032/5/2003 12:00:00 AMAPART
waiting for detail for 1 hr wall. at rim. 2/5/2003 11:06:26 AM other items ok. 2/5/2003 11:06:39 AM
BLD02-03017 BLD-Wall cover2/4/20032/5/20032/5/2003 12:00:00 AMAFAIL
###-#### Called contractor again still has areas that need staples at hd's, woud like to charge re-inspection fee, but at this time would be better to train framer on proper installation practices.as other areas do not inforce this inspection. 2/5/2003 10:19:08 AM 2/5/2003 10:20:05 AM
BLD02-02400 BLD-Framing/Rough-in2/5/20032/5/20032/5/2003 12:00:00 AMPFAIL
wade; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n posted at front window. 2/5/2003 3:10:46 PM
BLD02-00539 BLD-Final2/5/20032/5/20032/5/2003 12:00:00 AMPPASS
chris; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD02-02068 BLD-Framing/Rough-in2/5/20032/5/20032/5/2003 12:00:00 AMPPART
unable to do will reschedual for pm. 2/5/2003 11:11:37 AM Roof deck nailing ok to cover. 2/5/2003 4:23:25 PM
MEC02-02966 Final2/5/20032/5/20032/5/2003 12:00:00 AMPPASS
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Waited approxan hour for contractor to finish corrections so that I could final the house building permit. Would not typical do this a I do not have the time but owner would like to move in. 2/5/2003 4:25:52 PM 2/5/2003 4:49:13 PM
BLD02-03017 BLD-Framing/Rough-in2/5/20032/5/20032/5/2003 12:00:00 AMPPART
###-#### All ok now except rear left rear bedroom needs to be blocked at the osb seam contractor on site notified , also wrote this on c/n ok to side except the rear left back bedroom. 2/5/2003 3:34:17 PM
BLD02-01801 BLD-Final2/5/20032/5/20032/5/2003 12:00:00 AMPPASS
I waited approx an hour for mecanical contractor to finish corrections. so that home owner could get c/o. Note per home/owner request the lower 2foot front part of house does not have the rock work finished but is protected with building paper and will be on as soon as hired contractors can get to it. This has been allowed in the past a long as covered with paper. JUST FYI 2/5/2003 4:27:38 PM e 2/5/2003 4:27:40 PM 2/5/2003 4:29:29 PM 2/5/2003 4:30:36 PM 2/5/2003 4:48:56 PM
BLD02-01801 BLD-Final2/5/20032/5/20032/5/2003 12:00:00 AMPCANC
duplicate inspection. 2/5/2003 4:33:17 PM