FIR03-00764
| INSP-Final Inspection | 2/4/2004 | 2/5/2004 | 2/5/2004 12:00:00 AM | A | FAIL |
|
|
Upright heads are still overspaced on the Bangkok Thialand side of the wall 2/5/2004 11:19:50 AM
|
FIR03-00794
| INSP-Supply line flush | 2/4/2004 | 2/5/2004 | 2/5/2004 12:00:00 AM | A | PART |
|
|
Underground supply is OK to cover 2/5/2004 11:29:17 AM
|
FIR04-00001
| INSP-Sprinkler Rough-in/Hydro | 2/5/2004 | 2/5/2004 | 2/5/2004 12:00:00 AM | P | PASS |
|
|
Hood suppression system operated correctly 2/5/2004 9:48:06 AM
|
BLD02-01061
| FIRE-Alarm Testing | 2/5/2004 | 2/5/2004 | 2/5/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 2/5/2004 at 9:40:54 AM. Contact: ###-####.
|
BLD02-02711
| FIRE-Alarm Testing | 2/5/2004 | 2/5/2004 | 2/5/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 2/5/2004 at 9:41:33 AM. Contact: ###-####.
|
BLD02-01068
| FIRE-Alarm Testing | 2/5/2004 | 2/5/2004 | 2/5/2004 12:00:00 AM | P | PASS |
|
|
firelife safety finaled 2/5/2004 2:58:13 PM
|
FIR03-00594
| INSP-Sprinkler Rough-in/Hydro | 2/3/2004 | 2/5/2004 | 2/5/2004 12:00:00 AM | P | PASS |
|
|
Items on the correction notice have been corrected and the overhead hydro test is OK 2/5/2004 2:55:43 PM
|