FIR06-00592
| INSP-Final Inspection | 2/2/2007 | 2/5/2007 | 2/5/2007 4:38:48 PM | P | CANC |
|
|
Could not get access to the project due to an accident.
|
FIR06-00957
| INSP-Sprinkler Rough-in/Hydro | 2/2/2007 | 2/5/2007 | 2/5/2007 4:36:40 PM | A | PASS |
|
|
First floor of the C wing rough-in piping was completed today. Contractor needs to provide verification from truss manufacturer for the mounting of the eq bracing and the hanging of the 3" main.
|
FIR05-00479
| INSP-Final Inspection | 2/5/2007 | 2/5/2007 | 2/5/2007 4:34:24 PM | A | FAIL |
|
|
The remaining areas of the first floor were tested by Brian today except for the east elevator. See the city approved plans for locations of deficiencies.
|
FIR06-00779
| INSP-Final Inspection | 2/2/2007 | 2/5/2007 | 2/5/2007 12:43:45 PM | A | PASS |
|
|
permit finaled
|
FIR06-00591
| INSP-Supply line flush | 2/2/2007 | 2/5/2007 | 2/5/2007 12:42:28 PM | A | PART |
|
|
Underground flush passed. Overhead rough-in passed except for the 1 1/4" line to be run under the mezzanine. Fire pump has not been installed yet. Plans need to be resubmitted due to additional heads in the east end lower level calc area.
|