PLM07-01729
| Storm Drains | 2/5/2008 | 2/5/2008 | 2/5/2008 4:43:17 PM | P | PART |
|
|
north west and south west side of building water test ok still need to test north and northand south east side of building
|
PLM08-00051
| Final | 2/4/2008 | 2/5/2008 | 2/5/2008 4:26:36 PM | A | PART |
|
|
JOB CONTACT IS HENRY Phone #: ###-#### Internet Inspection Request from: ADAM WARR need to make a walk through with Bill T. WITH united water to see if any additional backflow protection in building will be needed oking temp on final
|
PLM08-00219
| Plumbing Rough-in | 2/5/2008 | 2/5/2008 | 2/5/2008 2:21:02 PM | P | CANC |
|
|
|
PLM07-03145
| Final | 2/4/2008 | 2/5/2008 | 2/5/2008 9:47:44 AM | A | PART |
|
|
todd Phone #: ###-#### need to repipe T&P drain line on existing water heater as per converation withTodd will recall when ready
|
PLM08-00051
| Final | 2/4/2008 | 2/5/2008 | 2/4/2008 11:45:07 AM | P | CANC |
|
|
JOB CONTACT IS HENRY Phone #: ###-#### Internet Inspection Request from: ADAM WARR Inspection cancelled from web by: ADAM WARR
|