BLD08-02198
| BLD-Conference | 2/5/2009 | 2/5/2009 | 2/5/2009 4:36:46 PM | P | CANC |
|
|
|
ESC08-00871
| BMP Violation | 2/5/2009 | 2/5/2009 | 2/5/2009 4:35:47 PM | P | PART |
|
|
wip on cleanup.
|
BLD08-02182
| BLD-Foundation | 2/4/2009 | 2/5/2009 | 2/5/2009 4:35:28 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:21:08 AM. Contact: ###-####.
|
ESC08-00872
| BMP Violation | 2/5/2009 | 2/5/2009 | 2/5/2009 4:35:16 PM | P | PART |
|
|
wip on cleanup.
|
BLD08-02183
| BLD-Foundation | 2/4/2009 | 2/5/2009 | 2/5/2009 4:34:52 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:22:24 AM. Contact: ###-####.
|
ESC08-00873
| BMP Violation | 2/5/2009 | 2/5/2009 | 2/5/2009 4:34:39 PM | P | PART |
|
|
wip on cleanup.
|
BLD08-02184
| BLD-Foundation | 2/4/2009 | 2/5/2009 | 2/5/2009 4:34:03 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:23:24 AM. Contact: ###-####.
|
ESC08-00874
| BMP Violation | 2/5/2009 | 2/5/2009 | 2/5/2009 4:33:43 PM | P | PART |
|
|
WIP on cleanup.
|
BLD08-02185
| BLD-Foundation | 2/4/2009 | 2/5/2009 | 2/5/2009 4:33:13 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:24:49 AM. Contact: ###-####.
|
ESC08-00532
| Random Inspection | 2/5/2009 | 2/5/2009 | 2/5/2009 3:56:31 PM | P | FAIL |
|
|
Needs to pick up const. debries at all areas of bldg. rp. was contacted and given verbal c/n.
|
BLD08-01321
| BLD-Other | 2/5/2009 | 2/5/2009 | 2/5/2009 3:55:31 PM | P | PASS |
|
|
joe Note: rebar - 4:00 pour schedule Phone #: ###-####
|
ESC09-00040
| Site Preparation | 2/5/2009 | 2/5/2009 | 2/5/2009 3:39:50 PM | P | PASS |
|
|
ESC permit sign is posted. Excavated soils are contained in backyard.
|
BLD09-00127
| BLD-Footing | 2/5/2009 | 2/5/2009 | 2/5/2009 3:38:49 PM | P | PASS |
|
|
kirt Note: late aternoon please Phone #: ###-####
|
BLD08-02197
| BLD-Footing | 2/4/2009 | 2/5/2009 | 2/5/2009 12:06:30 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 2:51:04 PM. Contact: ###-####. Interior footings.
|
BLD08-02198
| BLD-Footing | 2/4/2009 | 2/5/2009 | 2/5/2009 12:05:54 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 2:51:43 PM. Contact: ###-####. Interior footings.
|
BLD08-02199
| BLD-Footing | 2/4/2009 | 2/5/2009 | 2/5/2009 12:05:31 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 2:52:23 PM. Contact: ###-####. Interior footings.
|
BLD08-02200
| BLD-Footing | 2/4/2009 | 2/5/2009 | 2/5/2009 12:05:07 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 2:53:01 PM. Contact: ###-####. Interior footings.
|
BLD08-02497
| BLD-Framing/Rough-in | 2/4/2009 | 2/5/2009 | 2/5/2009 10:40:59 AM | A | NR |
|
|
Stan Phone #: ###-####. Needs mech. ri insp. and resolve ESC issues.
|
ESC08-01016
| Random Inspection | 2/5/2009 | 2/5/2009 | 2/5/2009 10:30:43 AM | A | FAIL |
|
|
Needs to pick up all construction debries and place in approved container, sweep sidewalk, gutterpan and street. verbal c/n given to RP.
|