Inspections for the day of: Thursday, February 5, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-01019 Random Inspection2/5/20092/5/20092/5/2009 4:06:05 PMPPASS
ESC08-00674 Site Final2/5/20092/5/20092/5/2009 4:02:29 PMPPASS
ESC04-01604 Site Final2/5/20092/5/20092/5/2009 3:30:11 PMPPASS
ESC08-01037 General Inspection2/5/20092/5/20092/5/2009 3:19:43 PMPFAIL
Wriiten notice to RP
Correction Notice:
1. Clean up all hard surface of all sediemtn and debris.
2. Pick up all trash debris and place into the proper container.
Failure to comply will result in a Stop Work Order. Will re-inspect on 2/6/09 AM.
ESC08-01016 General Inspection2/5/20092/5/20092/5/2009 3:19:02 PMPFAIL
Wriiten notice to RP
Correction Notice:
1. Clean up all hard surface of all sediemtn and debris.
2. Pick up all trash debris and place into the proper container.
Failure to comply will result in a Stop Work Order. Will re-inspect on 2/6/09 AM.
ESC08-00532 Random Inspection2/5/20092/5/20092/5/2009 2:33:33 PMAFAIL
Verbal to RP:
Clean up all trash debris within the project area. Place into a trash debris container. Will re-inspect on 2/12/09
ESC08-00706 Tracking Control2/5/20092/5/20092/5/2009 2:31:30 PMPFAIL
Verbal Correction to RP:
CLean up all hard surfaces of all sediment and debris by the end of the day or prior to any storm event. Will re-inspect on 2/6/09. AM
ESC08-00658 BMP Violation2/2/20092/5/20092/5/2009 11:14:20 AMAPASS
ESC08-00516 General Inspection2/2/20092/5/20092/5/2009 8:43:47 AMAFAIL
Correction Notice to RP via phone call:
1. Clean all hard surfaces of all sediment and debris.
2. Maintain storm drain inlet within the parking lot.
Complete by 2/6/09 or prior to any storm event. Will re-inspect on 2/6/09 11am. Failure to comply will result in a stop work order.