ESC09-00812
| Conference | 2/5/2010 | 2/5/2010 | 2/5/2010 2:11:07 PM | A | DONE |
|
|
Discuss water monitor requirements with Boise City Public Works who has been requested by Parks to assist in the monitoring requirements during de-watering of the pond: Provide Walt a copy of the permits conditions and reviewed the "special conditions" section. Walt will get back to me in regards to the discharge monitoring in the near future.
|
ESC09-00808
| General Inspection | 2/5/2010 | 2/5/2010 | 2/5/2010 1:26:42 PM | P | PART |
|
|
Met with RP, project foreman, ESC inspector (460). Reviewed permit general plan conditions. Overall site is in good shape, needs to control sub-contractors activities to achieve permit compliance. With high moisture conditions on bare soils parking of trailers and access to home sites should be limited to hard surfaces or track-out compliance will never to reached. Reviewed federal requirements as well, including the need to have a SWPPP and filing of the NOI. Daily sweeping and general cleanup of the site will be needed and entire site mechanical sweeping with a on call agreement will be needed. All parties were in agreement.
|