BLD09-02294
| FIRE-Final Inspection | 2/5/2010 | 2/5/2010 | 2/5/2010 4:01:04 PM | P | FAIL |
|
|
Repair the exit lights and emergency lights in the front office area as discussed.
|
FIR09-00320
| INSP-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 3:53:37 PM | P | PASS |
|
|
Permit finaled
|
BLD09-01024
| FIRE-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 3:53:14 PM | P | FAIL |
|
|
The life safety will be ok to pass when the project related fire alarm and sprinkler permits are finaled. The gate to the parking lot has not been installed yet but there is atleast 20' of clearance and the key for the lock on the gate is going to be provided in the knox box.
|
BLD09-01307
| FIRE-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 3:52:26 PM | P | FAIL |
|
|
The life safety will be ok to pass when the project related fire alarm and sprinkler permits are finaled. The gate to the parking lot has not been installed yet but there is atleast 20' of clearance and the key for the lock on the gate is going to be provided in the knox box.
|
FIR09-00723
| INSP-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 3:37:40 PM | P | PASS |
|
|
Permit finaled.
|
FIR09-00484
| INSP-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 2:59:26 PM | P | FAIL |
|
|
Provide forward flow test of backflow, provide certification of the backflow, provide NFPA 25, provide head wrench, provide service tag on riser and provide signage at the aux. drain on the north wall. The interconnection with the fire alarm panel tested ok.
|
FIR09-00435
| INSP-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 2:57:23 PM | P | PASS |
|
|
Permit finaled
|
FIR09-00741
| INSP-Final Inspection | 2/5/2010 | 2/5/2010 | 2/5/2010 2:56:28 PM | P | FAIL |
|
|
After testing all of the devices the monitoring station was contacted and they stated that the account was set up as test only which ment the signals were not correct, building address and call list had not been set up yet. The testing will need to be redone and the signals reverified. All of the devices reported correctly to the fire alarm panel. All three of the duct smoke detectors had been installed backwards and were correctly installed and tested as I waited.
|
FIR09-00704
| INSP-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 2:41:58 PM | P | PASS |
|
|
Permit finaled. The NetCon was 5. Steve is going to get the addressed changed from 130 to 104 Milwaukee. 130 is an address at this building but the permit is listed as 104 and 104 shares a common wall with the FACP.
|
FIR09-00723
| INSP-Alarm Testing | 2/4/2010 | 2/5/2010 | 2/5/2010 2:05:56 PM | P | PASS |
|
|
Permit finaled.
|
FIR09-00651
| INSP-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 12:11:25 PM | A | PASS |
|
|
Permit finaled. The extended pendants have been added in the small offices.
|
BLD09-01411
| FIRE-Final Inspection | 2/1/2010 | 2/5/2010 | 2/5/2010 11:07:21 AM | P | PASS |
|
|
Life safety passed. An emergency light has been provided near the exit door.
|
BLD10-00152
| FIRE-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 11:05:47 AM | A | CANC |
|
|
I spoke to Kelly Carlson ###-#### or ###-####and let him know that the project related fire sprinkler and fire alarm permits will need to be addressed prior to the fire life safety inspection/final.
|
FIR09-00423
| INSP-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 8:25:33 AM | A | PASS |
|
|
Permit finaled. The interconnect with the new FACP was verified.
|
BLD09-00267
| FIRE-Conference | 2/4/2010 | 2/5/2010 | 2/5/2010 8:24:49 AM | A | DONE |
|
|
The inspection for FIR09-00423 has been completed.
|
FIR09-00435
| INSP-Sprinkler Rough-in/Hydro | 2/4/2010 | 2/5/2010 | 2/4/2010 4:33:17 PM | P | CANC |
|
|
Would like to perform this in connjunction with fire life safety final. Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|