Inspections for the day of: Tuesday, February 5, 2013.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00326 FIR-Aging Inspection2/5/20132/5/20132/13/2013 8:16:57 AM NR
Dave is going to follow up
FIR12-00307 FIR-Aging Inspection2/5/20132/5/20132/13/2013 8:04:11 AM NR
Per steve with simplexgrinnell the DSC permits will be called in soon.
FIR12-00433 FIR-Aging Inspection2/5/20132/5/20132/13/2013 8:03:13 AM NR
I left a voice mail for Anita at ESI requesting job status and then I spoke to Buster at RME and he stated that there is a monitoring problem that they are waiting for ESI to resolve. I will speak to Anita when she calls.
FIR12-00177 FIR-Aging Inspection2/5/20132/5/20132/13/2013 7:54:32 AM NR
FIR13-00033 INSP-Sprinkler Rough-in2/5/20132/5/20132/5/2013 3:46:55 PMPPASS
Piping is ok to cover. Sheet rock will be verified at final.
BLD12-02688 FIRE-Conference2/5/20132/5/20132/5/2013 2:47:19 PMPDONE
Darren and I went over life safety requirements. All life safety items are ok except for what appears to be blocked upright sprinkler heads at new mechanical penatrations. This work was outside of the sprinkler contractors scope of work.
FIR12-00637 INSP-Sprinkler Rough-in/Hydro2/4/20132/5/20132/5/2013 2:41:46 PMAPASS
The overhead and underground hydro tests passed. One leaking head was tightened while I waited.
FIR12-00693 INSP-Sprinkler Rough-in2/4/20132/5/20132/5/2013 12:04:54 PMAPASS
Sprinkler piping ok to cover in the far left unit. Tenting was repaired in two locations as I waited.