BLD12-00680
| BLD-Wall cover | 2/5/2013 | 2/5/2013 | 2/5/2013 4:06:12 PM | P | PASS |
|
|
sheet rock inspection balance of building approve to tape
As late in day as possible say 4 would be great if possible >> Inspection requested via web by Fred Depold. south end and middle units, floors 1-3 ok to tape. North units floor 1 and 3 ok. Still working on 2nd. floor.
|
GCB12-00147
| GCB-Final | 2/4/2013 | 2/5/2013 | 2/5/2013 2:39:52 PM | P | FAIL |
|
|
Bob @ ###-#### PM Inspection. Provide blower door test results.
|
BLD12-03207
| BLD-Wall Bracing | 2/5/2013 | 2/5/2013 | 2/5/2013 1:42:56 PM | P | FAIL |
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Repair holddown in pfh. Pick up all missing panels.
|
BLD12-03248
| BLD-Framing/Rough-in | 2/4/2013 | 2/5/2013 | 2/5/2013 11:14:36 AM | A | PASS |
|
|
Kevin Phone #: ###-####. Hardlids, popouts and storefront ok.
|
BLD12-03207
| BLD-Wall Bracing | 2/4/2013 | 2/5/2013 | 2/5/2013 10:42:21 AM | A | NR |
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. No approved plans on site.
|
BLD12-02789
| BLD-Conference | 2/4/2013 | 2/5/2013 | 2/5/2013 10:41:46 AM | A | DONE |
|
|
john Phone #: ###-####. Contractor to remove screws from upstairs walls that were installed into grid and provide support to the structure.
|
GCB12-00161
| GCB-Shearwall | 2/4/2013 | 2/5/2013 | 2/5/2013 8:56:24 AM | A | PASS |
|
|
Bob @ ###-####. Exterior wall bracing ok.
|